Renewable energy in Lesotho
Lesotho has 33 MW of operating renewable capacity in the data, across 3 plants. Solar PV is the largest source at 33 MW (100% of the total). That is 100% of the 33 MW of operating power capacity of all kinds that the same tracker lists for Lesotho (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 33 MW, which is 100% of today's operating renewable capacity. A further 0 MW is under construction and 340 MW is announced or in pre-construction.
- Operating
- 33 MW3 plants
- Share of capacity in this dataset
- 100%of 33 MW operating, all kinds
- Started 2015 to 2025
- 33 MWoperating plants
- Pipeline
- 340 MW0 MW building, 340 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 33 MW | 3 | 100% | 0 | 140 MW |
| Onshore wind | 0 | 0 | 0.0% | 0 | 120 MW |
| Hydropower | 0 | 0 | 0.0% | 0 | 80 MW |
| All renewables | 33 MW | 3 | 100% | 0 MW | 340 MW |
Of the operating solar, 3 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2023 | 30 MW | 30 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2024 | 2 MW | 2 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2025 | 1 MW | 1 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2023 with 30 MW.
Largest renewable plants in Lesotho
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Ha Ramarothole solar farm | Solar PV | 30 MW | Operating | 2023 |
| 2 | Leribe District solar projectNC | Solar PV | 2 MW | Operating | 2024 |
| 3 | Maseru District solar projectNC | Solar PV | 1 MW | Operating | 2025 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Clean and Renewable Energy Park (Lesotho) solar farm | Solar PV | 100 MW | Announced | not recorded |
| 2 | Oxbow Polihali hydroelectric plant | Hydropower | 80 MW | Announced | 2029 |
| 3 | Mohale’s Hoek Wind Energy Project | Onshore wind | 72 MW | Announced | not recorded |
| 4 | Masite Nek wind farm | Onshore wind | 48 MW | Announced | not recorded |
| 5 | Ha Ramarothole solar farm | Solar PV | 40 MW | Announced | 2030 |
Questions
How much renewable energy capacity does Lesotho have?
Lesotho has 33 MW of operating renewable capacity across 3 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Lesotho?
Solar PV, with 33 MW operating, which is 100% of Lesotho's operating renewable capacity in the data.
What share of Lesotho's power capacity is renewable?
100% of the operating capacity in this dataset (33 MW of 33 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Lesotho building renewables?
Operating plants that started from 2015 to 2025 total 33 MW, and the biggest single year in the data is 2023 with 30 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Lesotho?
Ha Ramarothole solar farm, a solar pv plant of 30 MW, which started operating in 2023.
How much renewable capacity is being built or planned in Lesotho?
0 MW is under construction and 340 MW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.