Renewable energy in The Gambia

The Gambia has 23 MW of operating renewable capacity in the data, across 1 plants. Solar PV is the largest source at 23 MW (100% of the total). That is 16% of the 144 MW of operating power capacity of all kinds that the same tracker lists for The Gambia (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 23 MW, which is 100% of today's operating renewable capacity. A further 0 MW is under construction and 730 MW is announced or in pre-construction.

Operating
23 MW1 plants
Share of capacity in this dataset
16%of 144 MW operating, all kinds
Started 2015 to 2025
23 MWoperating plants
Pipeline
730 MW0 MW building, 730 MW announced

Capacity by technology

Renewable capacity in The Gambia by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV23 MW1100%0180 MW
Onshore wind000.0%0200 MW
Offshore wind000.0%0350 MW
All renewables23 MW1100%0 MW730 MW

The build-out by year

0 MW25 MW50 MW19901995200020052010201520202025
Solar PV
Show the figures as a table
Operating renewable capacity in The Gambia by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
202423 MW23 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2024 with 23 MW.

Largest renewable plants in The Gambia

The ten largest operating renewable plants in The Gambia.
#PlantTechnologyCapacityStatusStarted
1Jambur solar farmSolar PV23 MWOperating2024

Largest in the pipeline

The five largest renewable projects under construction or announced in The Gambia.
#PlantTechnologyCapacityStatusStarted
1The Gambia NEK offshore wind farmOffshore wind350 MWAnnounced2027
2The Gambia NEK onshore wind farmOnshore wind200 MWAnnounced2027
3Soma solar farm (The Gambia)Solar PV150 MWAnnounced2026
4Neo Themis solar farmSolar PV25 MWAnnouncednot recorded
5Tanji solar farmSolar PV5 MWAnnouncednot recorded

Questions

How much renewable energy capacity does The Gambia have?

The Gambia has 23 MW of operating renewable capacity across 1 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in The Gambia?

Solar PV, with 23 MW operating, which is 100% of The Gambia's operating renewable capacity in the data.

What share of The Gambia's power capacity is renewable?

16% of the operating capacity in this dataset (23 MW of 144 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is The Gambia building renewables?

Operating plants that started from 2015 to 2025 total 23 MW, and the biggest single year in the data is 2024 with 23 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in The Gambia?

Jambur solar farm, a solar pv plant of 23 MW, which started operating in 2024.

How much renewable capacity is being built or planned in The Gambia?

0 MW is under construction and 730 MW is announced or in pre-construction. Some announced projects will never be built.

Does The Gambia have offshore wind?

Yes: 0 MW operating, 0 MW under construction and 350 MW announced or in pre-construction.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.