Renewable energy in South Sudan

South Sudan has 48 MW of operating renewable capacity in the data, across 3 plants. Solar PV is the largest source at 48 MW (100% of the total). That is 29% of the 166 MW of operating power capacity of all kinds that the same tracker lists for South Sudan (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 48 MW, which is 100% of today's operating renewable capacity. A further 0 MW is under construction and 1.1 GW is announced or in pre-construction.

Operating
48 MW3 plants
Share of capacity in this dataset
29%of 166 MW operating, all kinds
Started 2015 to 2025
48 MWoperating plants
Pipeline
1.1 GW0 MW building, 1.1 GW announced

Capacity by technology

Renewable capacity in South Sudan by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV48 MW3100%00
Hydropower000.0%01.1 GW
All renewables48 MW3100%0 MW1.1 GW

Of the operating solar, 2 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW10 MW20 MW19901995200020052010201520202025
Solar PV
Show the figures as a table
Operating renewable capacity in South Sudan by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
20202 MW2 MW0000000
202212 MW12 MW0000000
202314 MW14 MW0000000
202520 MW20 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2025 with 20 MW.

Largest renewable plants in South Sudan

The ten largest operating renewable plants in South Sudan.
#PlantTechnologyCapacityStatusStarted
1Juba Ezra (Aptech Africa) solar farmSolar PV26 MWOperating2022
2Juba (Ezra) solar farmSolar PV20 MWOperating2025
3Wau solar projectNCSolar PV2 MWOperating2020

Largest in the pipeline

The five largest renewable projects under construction or announced in South Sudan.
#PlantTechnologyCapacityStatusStarted
1Grand Fula hydroelectric plantHydropower1.1 GWAnnounced2035

Questions

How much renewable energy capacity does South Sudan have?

South Sudan has 48 MW of operating renewable capacity across 3 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in South Sudan?

Solar PV, with 48 MW operating, which is 100% of South Sudan's operating renewable capacity in the data.

What share of South Sudan's power capacity is renewable?

29% of the operating capacity in this dataset (48 MW of 166 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is South Sudan building renewables?

Operating plants that started from 2015 to 2025 total 48 MW, and the biggest single year in the data is 2025 with 20 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in South Sudan?

Juba Ezra (Aptech Africa) solar farm, a solar pv plant of 26 MW, which started operating in 2022.

How much renewable capacity is being built or planned in South Sudan?

0 MW is under construction and 1.1 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.