Renewable energy in Comoros

Comoros has 25 MW of operating renewable capacity in the data, across 8 plants. Solar PV is the largest source at 25 MW (100% of the total). That is 100% of the 25 MW of operating power capacity of all kinds that the same tracker lists for Comoros (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 25 MW, which is 100% of today's operating renewable capacity. A further 0 MW is under construction and 15 MW is announced or in pre-construction.

Operating
25 MW8 plants
Share of capacity in this dataset
100%of 25 MW operating, all kinds
Started 2015 to 2025
25 MWoperating plants
Pipeline
15 MW0 MW building, 15 MW announced

Capacity by technology

Renewable capacity in Comoros by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV25 MW8100%00
Geothermal000.0%015 MW
All renewables25 MW8100%0 MW15 MW

Of the operating solar, 3 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW5 MW10 MW19901995200020052010201520202025
Solar PV
Show the figures as a table
Operating renewable capacity in Comoros by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
20209 MW9 MW0000000
20219 MW9 MW0000000
20221 MW1 MW0000000
20256 MW6 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2021 with 9 MW.

Largest renewable plants in Comoros

The ten largest operating renewable plants in Comoros.
#PlantTechnologyCapacityStatusStarted
1Moroni (ADFD) solar farmSolar PV6 MWOperating2025
2Moroni solar farmSolar PV5 MWOperating2021
3Mitsamiouli solar farmSolar PV4 MWOperating2020
4Anjouan solar projectNCSolar PV3 MWOperating2020
5Domoni solar farmSolar PV3 MWOperating2021
6Iconi solar farmSolar PV2 MWOperating2020
7Fomboni solar farmSolar PV2 MWOperating2021
8Sima solar farmSolar PV1 MWOperating2022

Largest in the pipeline

The five largest renewable projects under construction or announced in Comoros.
#PlantTechnologyCapacityStatusStarted
1Karthala geothermal power plantGeothermal15 MWAnnounced2029

Questions

How much renewable energy capacity does Comoros have?

Comoros has 25 MW of operating renewable capacity across 8 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Comoros?

Solar PV, with 25 MW operating, which is 100% of Comoros's operating renewable capacity in the data.

What share of Comoros's power capacity is renewable?

100% of the operating capacity in this dataset (25 MW of 25 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Comoros building renewables?

Operating plants that started from 2015 to 2025 total 25 MW, and the biggest single year in the data is 2021 with 9 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Comoros?

Moroni (ADFD) solar farm, a solar pv plant of 6 MW, which started operating in 2025.

How much renewable capacity is being built or planned in Comoros?

0 MW is under construction and 15 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.