Renewable energy in Benin

Benin has 28 MW of operating renewable capacity in the data, across 3 plants. Solar PV is the largest source at 28 MW (100% of the total). That is 18% of the 155 MW of operating power capacity of all kinds that the same tracker lists for Benin (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 28 MW, which is 100% of today's operating renewable capacity. A further 50 MW is under construction and 77 MW is announced or in pre-construction.

Operating
28 MW3 plants
Share of capacity in this dataset
18%of 155 MW operating, all kinds
Started 2015 to 2025
28 MWoperating plants
Pipeline
127 MW50 MW building, 77 MW announced

Capacity by technology

Renewable capacity in Benin by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV28 MW3100%50 MW50 MW
Onshore wind000.0%027 MW
All renewables28 MW3100%50 MW77 MW

Of the operating solar, 3 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW25 MW50 MW19901995200020052010201520202025
Solar PV
Show the figures as a table
Operating renewable capacity in Benin by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
202225 MW25 MW0000000
20243 MW3 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2022 with 25 MW.

Largest renewable plants in Benin

The ten largest operating renewable plants in Benin.
#PlantTechnologyCapacityStatusStarted
1Illoulofin SolarSolar PV25 MWOperating2022
2Borgou Department solar projectNCSolar PV2 MWOperating2024
3Gogounou solar projectNCSolar PV1 MWOperating2024

Largest in the pipeline

The five largest renewable projects under construction or announced in Benin.
#PlantTechnologyCapacityStatusStarted
1Port of Cotonou wind farmOnshore wind27 MWAnnouncednot recorded
2Illoulofin SolarSolar PV25 MWUnder constructionnot recorded
3Pobè solar farmSolar PV25 MWUnder constructionnot recorded
4Bohicon solar farmSolar PV15 MWAnnouncednot recorded
5Parakou solar farmSolar PV15 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Benin have?

Benin has 28 MW of operating renewable capacity across 3 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Benin?

Solar PV, with 28 MW operating, which is 100% of Benin's operating renewable capacity in the data.

What share of Benin's power capacity is renewable?

18% of the operating capacity in this dataset (28 MW of 155 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Benin building renewables?

Operating plants that started from 2015 to 2025 total 28 MW, and the biggest single year in the data is 2022 with 25 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Benin?

Illoulofin Solar, a solar pv plant of 25 MW, which started operating in 2022.

How much renewable capacity is being built or planned in Benin?

50 MW is under construction and 77 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.