Renewable energy in Seychelles

Seychelles has 13 MW of operating renewable capacity in the data, across 3 plants. Solar PV is the largest source at 7 MW (54% of the total). That is 12% of the 106 MW of operating power capacity of all kinds that the same tracker lists for Seychelles (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 7 MW, which is 54% of today's operating renewable capacity. A further 6 MW is under construction and 0 MW is announced or in pre-construction.

Operating
13 MW3 plants
Share of capacity in this dataset
12%of 106 MW operating, all kinds
Started 2015 to 2025
7 MWoperating plants
Pipeline
6 MW6 MW building, 0 MW announced

Capacity by technology

Renewable capacity in Seychelles by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV7 MW254%6 MW0
Onshore wind6 MW146%00
All renewables13 MW3100%6 MW0 MW

Of the operating solar, 5 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW5 MW10 MW19901995200020052010201520202025
Solar PVOnshore wind
Show the figures as a table
Operating renewable capacity in Seychelles by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
20136 MW006 MW00000
20195 MW5 MW0000000
20213 MW3 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2013 with 6 MW.

Largest renewable plants in Seychelles

The ten largest operating renewable plants in Seychelles.
#PlantTechnologyCapacityStatusStarted
1Port Victoria (Seychelles) wind farmOnshore wind6 MWOperating2013
2Romainville solar projectNCSolar PV5 MWOperating2019
3Desroches Island solar farmSolar PV3 MWOperating2021

Largest in the pipeline

The five largest renewable projects under construction or announced in Seychelles.
#PlantTechnologyCapacityStatusStarted
1Mahé Floating solar farmSolar PV6 MWUnder construction2026

Questions

How much renewable energy capacity does Seychelles have?

Seychelles has 13 MW of operating renewable capacity across 3 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Seychelles?

Solar PV, with 7 MW operating, which is 54% of Seychelles's operating renewable capacity in the data.

What share of Seychelles's power capacity is renewable?

12% of the operating capacity in this dataset (13 MW of 106 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Seychelles building renewables?

Operating plants that started from 2015 to 2025 total 7 MW, and the biggest single year in the data is 2013 with 6 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Seychelles?

Port Victoria (Seychelles) wind farm, a onshore wind plant of 6 MW, which started operating in 2013.

How much renewable capacity is being built or planned in Seychelles?

6 MW is under construction and 0 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.