Renewable energy in Cabo Verde

Cabo Verde has 52 MW of operating renewable capacity in the data, across 9 plants. Onshore wind is the largest source at 39 MW (74% of the total). That is 100% of the 52 MW of operating power capacity of all kinds that the same tracker lists for Cabo Verde (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 21 MW, which is 40% of today's operating renewable capacity. A further 5 MW is under construction and 26 MW is announced or in pre-construction.

Operating
52 MW9 plants
Share of capacity in this dataset
100%of 52 MW operating, all kinds
Started 2015 to 2025
21 MWoperating plants
Pipeline
31 MW5 MW building, 26 MW announced

Capacity by technology

Renewable capacity in Cabo Verde by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV14 MW526%016 MW
Onshore wind39 MW474%5 MW10 MW
All renewables52 MW9100%5 MW26 MW

Of the operating solar, 2 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW10 MW20 MW19901995200020052010201520202025
Solar PVOnshore wind
Show the figures as a table
Operating renewable capacity in Cabo Verde by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
20104 MW4 MW0000000
201115 MW0015 MW00000
201210 MW0010 MW00000
20247 MW7 MW0000000
202514 MW1 MW013 MW00000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 1 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2011 with 15 MW.

Largest renewable plants in Cabo Verde

The ten largest operating renewable plants in Cabo Verde.
#PlantTechnologyCapacityStatusStarted
1Santiago wind farmOnshore wind22 MWOperating2011
2Sal wind farmOnshore wind8 MWOperating2012
3São Vicente wind farmOnshore wind6 MWOperating2011
4Santa Maria (Cabo Verde) solar farmSolar PV5 MWOperating2024
5Santiago (Cabo Verde) solar farmSolar PV4 MWOperating2010
6Boa Vista (Cabo Verde) wind farmOnshore wind3 MWOperating2012
7São Vicente solar projectNCSolar PV2 MWOperating2024
8Fogo Island solar farmSolar PV1 MWOperatingnot recorded
9Santo Antão Island solar farmSolar PV1 MWOperating2025

Largest in the pipeline

The five largest renewable projects under construction or announced in Cabo Verde.
#PlantTechnologyCapacityStatusStarted
1Chã Gonçalves solar farmSolar PV10 MWAnnounced2028
2Chã Gonçalves wind farmOnshore wind10 MWAnnounced2028
3Santiago (Cabo Verde) solar farmSolar PV6 MWAnnouncednot recorded
4Norte de Baia wind farmOnshore wind5 MWUnder constructionnot recorded

Questions

How much renewable energy capacity does Cabo Verde have?

Cabo Verde has 52 MW of operating renewable capacity across 9 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Cabo Verde?

Onshore wind, with 39 MW operating, which is 74% of Cabo Verde's operating renewable capacity in the data.

What share of Cabo Verde's power capacity is renewable?

100% of the operating capacity in this dataset (52 MW of 52 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Cabo Verde building renewables?

Operating plants that started from 2015 to 2025 total 21 MW, and the biggest single year in the data is 2011 with 15 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Cabo Verde?

Santiago wind farm, a onshore wind plant of 22 MW, which started operating in 2011.

How much renewable capacity is being built or planned in Cabo Verde?

5 MW is under construction and 26 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.