Renewable energy in Burundi

Burundi has 51 MW of operating renewable capacity in the data, across 4 plants. Hydropower is the largest source at 35 MW (69% of the total). That is 63% of the 81 MW of operating power capacity of all kinds that the same tracker lists for Burundi (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 49 MW, which is 96% of today's operating renewable capacity. A further 0 MW is under construction and 8 MW is announced or in pre-construction.

Operating
51 MW4 plants
Share of capacity in this dataset
63%of 81 MW operating, all kinds
Started 2015 to 2025
49 MWoperating plants
Pipeline
8 MW0 MW building, 8 MW announced

Capacity by technology

Renewable capacity in Burundi by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV14 MW228%08 MW
Hydropower35 MW169%00
Bioenergy2 MW13.9%00
All renewables51 MW4100%0 MW8 MW

The build-out by year

0 MW25 MW50 MW19901995200020052010201520202025
Solar PVHydropower
Show the figures as a table
Operating renewable capacity in Burundi by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
202114 MW14 MW0000000
202535 MW000035 MW000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 2 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2025 with 35 MW.

Largest renewable plants in Burundi

The ten largest operating renewable plants in Burundi.
#PlantTechnologyCapacityStatusStarted
1Jiji hydroelectric plantHydropower35 MWOperating2025
2Bubanza SB solar projectSolar PV8 MWOperating2021
3Mubuga solar projectSolar PV6 MWOperating2021
4SOSUMO Mill power stationBioenergy2 MWOperatingnot recorded

Largest in the pipeline

The five largest renewable projects under construction or announced in Burundi.
#PlantTechnologyCapacityStatusStarted
1Mubuga solar projectSolar PV8 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Burundi have?

Burundi has 51 MW of operating renewable capacity across 4 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Burundi?

Hydropower, with 35 MW operating, which is 69% of Burundi's operating renewable capacity in the data.

What share of Burundi's power capacity is renewable?

63% of the operating capacity in this dataset (51 MW of 81 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Burundi building renewables?

Operating plants that started from 2015 to 2025 total 49 MW, and the biggest single year in the data is 2025 with 35 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Burundi?

Jiji hydroelectric plant, a hydropower plant of 35 MW, which started operating in 2025.

How much renewable capacity is being built or planned in Burundi?

0 MW is under construction and 8 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.