Renewable energy in Serbia
Serbia has 1.8 GW of operating renewable capacity in the data, across 55 plants. Hydropower is the largest source at 944 MW (53% of the total). That is 23% of the 7.8 GW of operating power capacity of all kinds that the same tracker lists for Serbia (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 811 MW, which is 45% of today's operating renewable capacity. A further 66 MW is under construction and 10.9 GW is announced or in pre-construction.
- Operating
- 1.8 GW55 plants
- Share of capacity in this dataset
- 23%of 7.8 GW operating, all kinds
- Started 2015 to 2025
- 811 MWoperating plants
- Pipeline
- 11.0 GW66 MW building, 10.9 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 199 MW | 37 | 11% | 0 | 4.1 GW |
| Onshore wind | 604 MW | 8 | 34% | 66 MW | 6.8 GW |
| Hydropower | 944 MW | 7 | 53% | 0 | 0 |
| Bioenergy | 37 MW | 3 | 2.1% | 0 | 0 |
| All renewables | 1.8 GW | 55 | 100% | 66 MW | 10.9 GW |
Of the operating solar, 172 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 1990 | 80 MW | 0 | 0 | 0 | 0 | 80 MW | 0 | 0 | 0 |
| 2009 | 20 MW | 0 | 0 | 20 MW | 0 | 0 | 0 | 0 | 0 |
| 2017 | 14 MW | 12 MW | 0 | 0 | 0 | 0 | 0 | 2 MW | 0 |
| 2018 | 57 MW | 11 MW | 0 | 42 MW | 0 | 0 | 0 | 5 MW | 0 |
| 2019 | 336 MW | 4 MW | 0 | 332 MW | 0 | 0 | 0 | 0 | 0 |
| 2021 | 1 MW | 1 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2022 | 5 MW | 5 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2023 | 73 MW | 43 MW | 0 | 0 | 0 | 0 | 0 | 30 MW | 0 |
| 2024 | 265 MW | 65 MW | 0 | 200 MW | 0 | 0 | 0 | 0 | 0 |
| 2025 | 60 MW | 60 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 10 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1966 with 420 MW.
Largest renewable plants in Serbia
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Bajina Bašta hydroelectric plant | Hydropower | 420 MW | Operating | 1966 |
| 2 | Cibuk wind farm | Onshore wind | 158 MW | Operating | 2019 |
| 3 | Vlasina hydroelectric plant | Hydropower | 129 MW | Operating | 1955 |
| 4 | Zvornik hydroelectric plant | Hydropower | 126 MW | Operating | 1955 |
| 5 | Krivača wind farm | Onshore wind | 106 MW | Operating | 2024 |
| 6 | Kovacica wind farm | Onshore wind | 105 MW | Operating | 2019 |
| 7 | Bistrica Eps hydroelectric plant | Hydropower | 102 MW | Operating | 1959 |
| 8 | Pupin wind farm | Onshore wind | 95 MW | Operating | 2024 |
| 9 | Pirot hydroelectric plant | Hydropower | 80 MW | Operating | 1990 |
| 10 | Kosava wind farm | Onshore wind | 69 MW | Operating | 2019 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Bor wind farm | Onshore wind | 1.5 GW | Announced | not recorded |
| 2 | Stiško Polje wind farm | Onshore wind | 1.0 GW | Announced | not recorded |
| 3 | Samos wind farm | Onshore wind | 888 MW | Announced | not recorded |
| 4 | Kula solar farm | Solar PV | 660 MW | Announced | 2026 |
| 5 | Banat wind farm | Onshore wind | 563 MW | Announced | 2027 |
Questions
How much renewable energy capacity does Serbia have?
Serbia has 1.8 GW of operating renewable capacity across 55 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Serbia?
Hydropower, with 944 MW operating, which is 53% of Serbia's operating renewable capacity in the data.
What share of Serbia's power capacity is renewable?
23% of the operating capacity in this dataset (1.8 GW of 7.8 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Serbia building renewables?
Operating plants that started from 2015 to 2025 total 811 MW, and the biggest single year in the data is 1966 with 420 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Serbia?
Bajina Bašta hydroelectric plant, a hydropower plant of 420 MW, which started operating in 1966.
How much renewable capacity is being built or planned in Serbia?
66 MW is under construction and 10.9 GW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.