Renewable energy in Lithuania

Lithuania has 2.4 GW of operating renewable capacity in the data, across 163 plants. Onshore wind is the largest source at 1.3 GW (54% of the total). That is 54% of the 4.5 GW of operating power capacity of all kinds that the same tracker lists for Lithuania (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 2.0 GW, which is 84% of today's operating renewable capacity. A further 185 MW is under construction and 3.8 GW is announced or in pre-construction.

Operating
2.4 GW163 plants
Share of capacity in this dataset
54%of 4.5 GW operating, all kinds
Started 2015 to 2025
2.0 GWoperating plants
Pipeline
4.0 GW185 MW building, 3.8 GW announced

Capacity by technology

Renewable capacity in Lithuania by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV872 MW13636%01.1 GW
Onshore wind1.3 GW2354%185 MW1.3 GW
Offshore wind000.0%01.4 GW
Hydropower101 MW14.2%00
Bioenergy144 MW35.9%00
All renewables2.4 GW163100%185 MW3.8 GW

Of the operating solar, 531 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW500 MW1.0 GW19901995200020052010201520202025
Solar PVOnshore windHydropowerBioenergy
Show the figures as a table
Operating renewable capacity in Lithuania by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
200630 MW0030 MW00000
200716 MW0016 MW00000
200814 MW0014 MW00000
200920 MW0020 MW00000
201070 MW0070 MW00000
201221 MW0021 MW00000
201359 MW0039 MW00020 MW0
201584 MW0084 MW00000
201674 MW0074 MW00000
201783 MW38 MW045 MW00000
20184 MW4 MW0000000
202049 MW25 MW0000024 MW0
2021119 MW15 MW084 MW00020 MW0
202271 MW71 MW0000000
2023537 MW288 MW0249 MW00000
2024444 MW246 MW0118 MW00080 MW0
2025579 MW185 MW0394 MW00000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 50 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2025 with 579 MW.

Largest renewable plants in Lithuania

The ten largest operating renewable plants in Lithuania.
#PlantTechnologyCapacityStatusStarted
1Kelme (Ignitis) wind farmOnshore wind314 MWOperating2025
2Kaunas Algirdas Brazauskas hydroelectric plantHydropower101 MWOperating1959
3Moletai solar farmSolar PV100 MWOperating2024
4Vilniaus Kogeneracinė power stationBioenergy100 MWOperating2021
5Švenčionys solar farmSolar PV80 MWOperating2025
6Jurbarkas (Green Genius) wind farmOnshore wind80 MWOperating2025
7Akmene wind farmOnshore wind75 MWOperating2024
8Pagegiai 13 wind farmOnshore wind74 MWOperating2016
9Jonava wind farmOnshore wind70 MWOperating2023
10Telšiai (Encavis) wind farmOnshore wind69 MWOperating2021

Largest in the pipeline

The five largest renewable projects under construction or announced in Lithuania.
#PlantTechnologyCapacityStatusStarted
1Baltic Sea wind farmOffshore wind1.4 GWAnnounced2030
2Ignalina II solar farmSolar PV375 MWAnnouncednot recorded
3Pagėgiai wind farmOnshore wind264 MWAnnounced2026
4Jonava solar farmSolar PV252 MWAnnounced2026
5Plunge wind farmOnshore wind218 MWAnnounced2026

Questions

How much renewable energy capacity does Lithuania have?

Lithuania has 2.4 GW of operating renewable capacity across 163 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Lithuania?

Onshore wind, with 1.3 GW operating, which is 54% of Lithuania's operating renewable capacity in the data.

What share of Lithuania's power capacity is renewable?

54% of the operating capacity in this dataset (2.4 GW of 4.5 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Lithuania building renewables?

Operating plants that started from 2015 to 2025 total 2.0 GW, and the biggest single year in the data is 2025 with 579 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Lithuania?

Kelme (Ignitis) wind farm, a onshore wind plant of 314 MW, which started operating in 2025.

How much renewable capacity is being built or planned in Lithuania?

185 MW is under construction and 3.8 GW is announced or in pre-construction. Some announced projects will never be built.

Does Lithuania have offshore wind?

Yes: 0 MW operating, 0 MW under construction and 1.4 GW announced or in pre-construction.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.