Renewable energy in Latvia
Latvia has 2.2 GW of operating renewable capacity in the data, across 91 plants. Hydropower is the largest source at 1.5 GW (68% of the total). That is 67% of the 3.3 GW of operating power capacity of all kinds that the same tracker lists for Latvia (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 644 MW, which is 29% of today's operating renewable capacity. A further 225 MW is under construction and 5.6 GW is announced or in pre-construction.
- Operating
- 2.2 GW91 plants
- Share of capacity in this dataset
- 67%of 3.3 GW operating, all kinds
- Started 2015 to 2025
- 644 MWoperating plants
- Pipeline
- 5.8 GW225 MW building, 5.6 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 585 MW | 84 | 26% | 225 MW | 1.8 GW |
| Onshore wind | 100 MW | 3 | 4.5% | 0 | 2.8 GW |
| Offshore wind | 0 | 0 | 0.0% | 0 | 1.0 GW |
| Hydropower | 1.5 GW | 3 | 68% | 0 | 0 |
| Bioenergy | 23 MW | 1 | 1.0% | 0 | 20 MW |
| All renewables | 2.2 GW | 91 | 100% | 225 MW | 5.6 GW |
Of the operating solar, 346 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2002 | 20 MW | 0 | 0 | 20 MW | 0 | 0 | 0 | 0 | 0 |
| 2012 | 21 MW | 0 | 0 | 21 MW | 0 | 0 | 0 | 0 | 0 |
| 2013 | 23 MW | 0 | 0 | 0 | 0 | 0 | 0 | 23 MW | 0 |
| 2017 | 12 MW | 12 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2018 | 2 MW | 2 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2022 | 63 MW | 4 MW | 0 | 59 MW | 0 | 0 | 0 | 0 | 0 |
| 2023 | 111 MW | 111 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2024 | 200 MW | 200 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2025 | 256 MW | 256 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1965 with 894 MW.
Largest renewable plants in Latvia
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Plavinas hydroelectric plant | Hydropower | 894 MW | Operating | 1965 |
| 2 | Riga hydroelectric plant | Hydropower | 402 MW | Operating | 1974 |
| 3 | Kegums hydroelectric plant | Hydropower | 240 MW | Operating | 1940 |
| 4 | Stelpe solar farm | Solar PV | 145 MW | Operating | 2025 |
| 5 | Vārme solar farm | Solar PV | 94 MW | Operating | 2025 |
| 6 | Targale wind farm | Onshore wind | 59 MW | Operating | 2022 |
| 7 | Gren Jelgava power station | Bioenergy | 23 MW | Operating | 2013 |
| 8 | Pope wind farm | Onshore wind | 21 MW | Operating | 2012 |
| 9 | Grobina wind farm | Onshore wind | 20 MW | Operating | 2002 |
| 10 | Smiltenes Pagasts solar projectNC | Solar PV | 17 MW | Operating | 2024 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Elwind wind farm (Latvia) | Offshore wind | 1.0 GW | Announced | 2030 |
| 2 | Valmiera-Valka wind farm | Onshore wind | 480 MW | Announced | not recorded |
| 3 | Nīcgale wind farm | Onshore wind | 425 MW | Announced | not recorded |
| 4 | Balvi solar farm | Solar PV | 400 MW | Announced | not recorded |
| 5 | Lazas solar farm | Solar PV | 400 MW | Announced | not recorded |
Questions
How much renewable energy capacity does Latvia have?
Latvia has 2.2 GW of operating renewable capacity across 91 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Latvia?
Hydropower, with 1.5 GW operating, which is 68% of Latvia's operating renewable capacity in the data.
What share of Latvia's power capacity is renewable?
67% of the operating capacity in this dataset (2.2 GW of 3.3 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Latvia building renewables?
Operating plants that started from 2015 to 2025 total 644 MW, and the biggest single year in the data is 1965 with 894 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Latvia?
Plavinas hydroelectric plant, a hydropower plant of 894 MW, which started operating in 1965.
How much renewable capacity is being built or planned in Latvia?
225 MW is under construction and 5.6 GW is announced or in pre-construction. Some announced projects will never be built.
Does Latvia have offshore wind?
Yes: 0 MW operating, 0 MW under construction and 1.0 GW announced or in pre-construction.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.