Renewable energy in Latvia

Latvia has 2.2 GW of operating renewable capacity in the data, across 91 plants. Hydropower is the largest source at 1.5 GW (68% of the total). That is 67% of the 3.3 GW of operating power capacity of all kinds that the same tracker lists for Latvia (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 644 MW, which is 29% of today's operating renewable capacity. A further 225 MW is under construction and 5.6 GW is announced or in pre-construction.

Operating
2.2 GW91 plants
Share of capacity in this dataset
67%of 3.3 GW operating, all kinds
Started 2015 to 2025
644 MWoperating plants
Pipeline
5.8 GW225 MW building, 5.6 GW announced

Capacity by technology

Renewable capacity in Latvia by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV585 MW8426%225 MW1.8 GW
Onshore wind100 MW34.5%02.8 GW
Offshore wind000.0%01.0 GW
Hydropower1.5 GW368%00
Bioenergy23 MW11.0%020 MW
All renewables2.2 GW91100%225 MW5.6 GW

Of the operating solar, 346 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW250 MW500 MW19901995200020052010201520202025
Solar PVOnshore windHydropowerBioenergy
Show the figures as a table
Operating renewable capacity in Latvia by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
200220 MW0020 MW00000
201221 MW0021 MW00000
201323 MW00000023 MW0
201712 MW12 MW0000000
20182 MW2 MW0000000
202263 MW4 MW059 MW00000
2023111 MW111 MW0000000
2024200 MW200 MW0000000
2025256 MW256 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1965 with 894 MW.

Largest renewable plants in Latvia

The ten largest operating renewable plants in Latvia.
#PlantTechnologyCapacityStatusStarted
1Plavinas hydroelectric plantHydropower894 MWOperating1965
2Riga hydroelectric plantHydropower402 MWOperating1974
3Kegums hydroelectric plantHydropower240 MWOperating1940
4Stelpe solar farmSolar PV145 MWOperating2025
5Vārme solar farmSolar PV94 MWOperating2025
6Targale wind farmOnshore wind59 MWOperating2022
7Gren Jelgava power stationBioenergy23 MWOperating2013
8Pope wind farmOnshore wind21 MWOperating2012
9Grobina wind farmOnshore wind20 MWOperating2002
10Smiltenes Pagasts solar projectNCSolar PV17 MWOperating2024

Largest in the pipeline

The five largest renewable projects under construction or announced in Latvia.
#PlantTechnologyCapacityStatusStarted
1Elwind wind farm (Latvia)Offshore wind1.0 GWAnnounced2030
2Valmiera-Valka wind farmOnshore wind480 MWAnnouncednot recorded
3Nīcgale wind farmOnshore wind425 MWAnnouncednot recorded
4Balvi solar farmSolar PV400 MWAnnouncednot recorded
5Lazas solar farmSolar PV400 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Latvia have?

Latvia has 2.2 GW of operating renewable capacity across 91 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Latvia?

Hydropower, with 1.5 GW operating, which is 68% of Latvia's operating renewable capacity in the data.

What share of Latvia's power capacity is renewable?

67% of the operating capacity in this dataset (2.2 GW of 3.3 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Latvia building renewables?

Operating plants that started from 2015 to 2025 total 644 MW, and the biggest single year in the data is 1965 with 894 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Latvia?

Plavinas hydroelectric plant, a hydropower plant of 894 MW, which started operating in 1965.

How much renewable capacity is being built or planned in Latvia?

225 MW is under construction and 5.6 GW is announced or in pre-construction. Some announced projects will never be built.

Does Latvia have offshore wind?

Yes: 0 MW operating, 0 MW under construction and 1.0 GW announced or in pre-construction.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.