Renewable energy in Estonia

Estonia has 1.8 GW of operating renewable capacity in the data, across 208 plants. Solar PV is the largest source at 1.0 GW (57% of the total). That is 80% of the 2.3 GW of operating power capacity of all kinds that the same tracker lists for Estonia (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 1.5 GW, which is 83% of today's operating renewable capacity. A further 344 MW is under construction and 12.3 GW is announced or in pre-construction.

Operating
1.8 GW208 plants
Share of capacity in this dataset
80%of 2.3 GW operating, all kinds
Started 2015 to 2025
1.5 GWoperating plants
Pipeline
12.7 GW344 MW building, 12.3 GW announced

Capacity by technology

Renewable capacity in Estonia by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV1.0 GW19057%344 MW0
Onshore wind688 MW1437%070 MW
Offshore wind000.0%012.2 GW
Bioenergy105 MW45.7%091 MW
All renewables1.8 GW208100%344 MW12.3 GW

Of the operating solar, 657 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW500 MW1.0 GW19901995200020052010201520202025
Solar PVOnshore windBioenergy
Show the figures as a table
Operating renewable capacity in Estonia by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
200518 MW0018 MW00000
200721 MW0021 MW00000
200989 MW0039 MW00050 MW0
201016 MW0016 MW00000
201148 MW0024 MW00024 MW0
2012101 MW00101 MW00000
201322 MW0022 MW00000
201518 MW0018 MW00000
201621 MW00000021 MW0
20174 MW4 MW0000000
201828 MW28 MW0000000
201986 MW76 MW0000010 MW0
2020140 MW128 MW012 MW00000
2021128 MW128 MW0000000
202226 MW26 MW0000000
2023249 MW189 MW060 MW00000
2024612 MW255 MW0357 MW00000
2025211 MW211 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2024 with 612 MW.

Largest renewable plants in Estonia

The ten largest operating renewable plants in Estonia.
#PlantTechnologyCapacityStatusStarted
1Sopi-Tootsi wind farmOnshore wind255 MWOperating2024
2Aidu wind farmOnshore wind102 MWOperating2024
3Kirikmäe solar farmSolar PV77 MWOperating2024
4Sopi solar farmSolar PV74 MWOperating2025
5Laaneranna solar farmSolar PV70 MWOperating2024
6Pihlaka solar farmSolar PV53 MWOperating2025
7Väo power stationBioenergy46 MWOperating2009
8Raba solar farmSolar PV45 MWOperating2025
9Paldiski wind farmOnshore wind44 MWOperating2012
10Udria wind farmOnshore wind40 MWOperating2012

Largest in the pipeline

The five largest renewable projects under construction or announced in Estonia.
#PlantTechnologyCapacityStatusStarted
1Saare 2.1 wind farmOffshore wind1.6 GWAnnounced2030
2Liivi 2 wind farmOffshore wind1.4 GWAnnounced2035
3Saare wind farmOffshore wind1.4 GWAnnounced2031
4Saare Liivi wind farmOffshore wind1.2 GWAnnounced2028
5Elwind wind farmOffshore wind1.0 GWAnnounced2033

Questions

How much renewable energy capacity does Estonia have?

Estonia has 1.8 GW of operating renewable capacity across 208 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Estonia?

Solar PV, with 1.0 GW operating, which is 57% of Estonia's operating renewable capacity in the data.

What share of Estonia's power capacity is renewable?

80% of the operating capacity in this dataset (1.8 GW of 2.3 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Estonia building renewables?

Operating plants that started from 2015 to 2025 total 1.5 GW, and the biggest single year in the data is 2024 with 612 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Estonia?

Sopi-Tootsi wind farm, a onshore wind plant of 255 MW, which started operating in 2024.

How much renewable capacity is being built or planned in Estonia?

344 MW is under construction and 12.3 GW is announced or in pre-construction. Some announced projects will never be built.

Does Estonia have offshore wind?

Yes: 0 MW operating, 0 MW under construction and 12.2 GW announced or in pre-construction.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.