Renewable energy in Bosnia and Herzegovina

Bosnia and Herzegovina has 2.5 GW of operating renewable capacity in the data, across 94 plants. Hydropower is the largest source at 1.7 GW (69% of the total). That is 51% of the 4.9 GW of operating power capacity of all kinds that the same tracker lists for Bosnia and Herzegovina (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 819 MW, which is 33% of today's operating renewable capacity. A further 500 MW is under construction and 5.2 GW is announced or in pre-construction.

Operating
2.5 GW94 plants
Share of capacity in this dataset
51%of 4.9 GW operating, all kinds
Started 2015 to 2025
819 MWoperating plants
Pipeline
5.7 GW500 MW building, 5.2 GW announced

Capacity by technology

Renewable capacity in Bosnia and Herzegovina by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV540 MW7522%150 MW2.2 GW
Onshore wind244 MW59.8%191 MW2.7 GW
Hydropower1.7 GW1469%159 MW335 MW
All renewables2.5 GW94100%500 MW5.2 GW

Of the operating solar, 213 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW250 MW500 MW19901995200020052010201520202025
Solar PVOnshore windHydropower
Show the figures as a table
Operating renewable capacity in Bosnia and Herzegovina by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
200430 MW000030 MW000
201060 MW000060 MW000
201711 MW11 MW0000000
201851 MW0051 MW00000
201951 MW15 MW036 MW00000
202186 MW38 MW048 MW00000
20229 MW9 MW0000000
2023115 MW115 MW0000000
2024367 MW283 MW084 MW00000
2025129 MW69 MW025 MW035 MW000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2024 with 367 MW.

Largest renewable plants in Bosnia and Herzegovina

The ten largest operating renewable plants in Bosnia and Herzegovina.
#PlantTechnologyCapacityStatusStarted
1Višegrad hydroelectric plantHydropower315 MWOperating1989
2Dubrovnik hydroelectric plantHydropower252 MWOperating1965
3Salakovac hydroelectric plantHydropower210 MWOperating1981
4Jablanica hydroelectric plantHydropower180 MWOperating1955
5Rama hydroelectric plantHydropower160 MWOperating1968
6Grabovica hydroelectric plantHydropower114 MWOperating1982
7Bočac hydroelectric plantHydropower110 MWOperating1981
8Trebinje I hydroelectric plantHydropower100 MWOperating1968
9Hodovo solar farmSolar PV93 MWOperating2024
10Ivovik wind farmOnshore wind84 MWOperating2024

Largest in the pipeline

The five largest renewable projects under construction or announced in Bosnia and Herzegovina.
#PlantTechnologyCapacityStatusStarted
1Nevesinje solar farmSolar PV500 MWAnnouncednot recorded
2Kruzi wind farmOnshore wind405 MWAnnouncednot recorded
3Vaganj wind farmOnshore wind405 MWAnnouncednot recorded
4Bileća solar farmSolar PV270 MWAnnouncednot recorded
5VE Kacelj wind farmOnshore wind200 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Bosnia and Herzegovina have?

Bosnia and Herzegovina has 2.5 GW of operating renewable capacity across 94 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Bosnia and Herzegovina?

Hydropower, with 1.7 GW operating, which is 69% of Bosnia and Herzegovina's operating renewable capacity in the data.

What share of Bosnia and Herzegovina's power capacity is renewable?

51% of the operating capacity in this dataset (2.5 GW of 4.9 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Bosnia and Herzegovina building renewables?

Operating plants that started from 2015 to 2025 total 819 MW, and the biggest single year in the data is 2024 with 367 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Bosnia and Herzegovina?

Višegrad hydroelectric plant, a hydropower plant of 315 MW, which started operating in 1989.

How much renewable capacity is being built or planned in Bosnia and Herzegovina?

500 MW is under construction and 5.2 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.