Renewable energy in Bosnia and Herzegovina
Bosnia and Herzegovina has 2.5 GW of operating renewable capacity in the data, across 94 plants. Hydropower is the largest source at 1.7 GW (69% of the total). That is 51% of the 4.9 GW of operating power capacity of all kinds that the same tracker lists for Bosnia and Herzegovina (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 819 MW, which is 33% of today's operating renewable capacity. A further 500 MW is under construction and 5.2 GW is announced or in pre-construction.
- Operating
- 2.5 GW94 plants
- Share of capacity in this dataset
- 51%of 4.9 GW operating, all kinds
- Started 2015 to 2025
- 819 MWoperating plants
- Pipeline
- 5.7 GW500 MW building, 5.2 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 540 MW | 75 | 22% | 150 MW | 2.2 GW |
| Onshore wind | 244 MW | 5 | 9.8% | 191 MW | 2.7 GW |
| Hydropower | 1.7 GW | 14 | 69% | 159 MW | 335 MW |
| All renewables | 2.5 GW | 94 | 100% | 500 MW | 5.2 GW |
Of the operating solar, 213 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2004 | 30 MW | 0 | 0 | 0 | 0 | 30 MW | 0 | 0 | 0 |
| 2010 | 60 MW | 0 | 0 | 0 | 0 | 60 MW | 0 | 0 | 0 |
| 2017 | 11 MW | 11 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2018 | 51 MW | 0 | 0 | 51 MW | 0 | 0 | 0 | 0 | 0 |
| 2019 | 51 MW | 15 MW | 0 | 36 MW | 0 | 0 | 0 | 0 | 0 |
| 2021 | 86 MW | 38 MW | 0 | 48 MW | 0 | 0 | 0 | 0 | 0 |
| 2022 | 9 MW | 9 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2023 | 115 MW | 115 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2024 | 367 MW | 283 MW | 0 | 84 MW | 0 | 0 | 0 | 0 | 0 |
| 2025 | 129 MW | 69 MW | 0 | 25 MW | 0 | 35 MW | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2024 with 367 MW.
Largest renewable plants in Bosnia and Herzegovina
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Višegrad hydroelectric plant | Hydropower | 315 MW | Operating | 1989 |
| 2 | Dubrovnik hydroelectric plant | Hydropower | 252 MW | Operating | 1965 |
| 3 | Salakovac hydroelectric plant | Hydropower | 210 MW | Operating | 1981 |
| 4 | Jablanica hydroelectric plant | Hydropower | 180 MW | Operating | 1955 |
| 5 | Rama hydroelectric plant | Hydropower | 160 MW | Operating | 1968 |
| 6 | Grabovica hydroelectric plant | Hydropower | 114 MW | Operating | 1982 |
| 7 | Bočac hydroelectric plant | Hydropower | 110 MW | Operating | 1981 |
| 8 | Trebinje I hydroelectric plant | Hydropower | 100 MW | Operating | 1968 |
| 9 | Hodovo solar farm | Solar PV | 93 MW | Operating | 2024 |
| 10 | Ivovik wind farm | Onshore wind | 84 MW | Operating | 2024 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Nevesinje solar farm | Solar PV | 500 MW | Announced | not recorded |
| 2 | Kruzi wind farm | Onshore wind | 405 MW | Announced | not recorded |
| 3 | Vaganj wind farm | Onshore wind | 405 MW | Announced | not recorded |
| 4 | Bileća solar farm | Solar PV | 270 MW | Announced | not recorded |
| 5 | VE Kacelj wind farm | Onshore wind | 200 MW | Announced | not recorded |
Questions
How much renewable energy capacity does Bosnia and Herzegovina have?
Bosnia and Herzegovina has 2.5 GW of operating renewable capacity across 94 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Bosnia and Herzegovina?
Hydropower, with 1.7 GW operating, which is 69% of Bosnia and Herzegovina's operating renewable capacity in the data.
What share of Bosnia and Herzegovina's power capacity is renewable?
51% of the operating capacity in this dataset (2.5 GW of 4.9 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Bosnia and Herzegovina building renewables?
Operating plants that started from 2015 to 2025 total 819 MW, and the biggest single year in the data is 2024 with 367 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Bosnia and Herzegovina?
Višegrad hydroelectric plant, a hydropower plant of 315 MW, which started operating in 1989.
How much renewable capacity is being built or planned in Bosnia and Herzegovina?
500 MW is under construction and 5.2 GW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.