Renewable energy in Ecuador

Ecuador has 5.5 GW of operating renewable capacity in the data, across 54 plants. Hydropower is the largest source at 5.3 GW (96% of the total). That is 78% of the 7.1 GW of operating power capacity of all kinds that the same tracker lists for Ecuador (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 3.1 GW, which is 57% of today's operating renewable capacity. A further 0 MW is under construction and 11.6 GW is announced or in pre-construction.

Operating
5.5 GW54 plants
Share of capacity in this dataset
78%of 7.1 GW operating, all kinds
Started 2015 to 2025
3.1 GWoperating plants
Pipeline
11.6 GW0 MW building, 11.6 GW announced

Capacity by technology

Renewable capacity in Ecuador by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV24 MW140.4%01.4 GW
Onshore wind66 MW21.2%0435 MW
Hydropower5.3 GW3596%09.5 GW
Geothermal000.0%0193 MW
Bioenergy142 MW32.6%00
All renewables5.5 GW54100%0 MW11.6 GW

Of the operating solar, 13 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW1.0 GW2.0 GW19901995200020052010201520202025
Solar PVOnshore windHydropowerBioenergy
Show the figures as a table
Operating renewable capacity in Ecuador by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
199015 MW000015 MW000
2006100 MW000070 MW030 MW0
2007230 MW0000230 MW000
201226 MW000026 MW000
201359 MW1 MW016 MW042 MW000
2014216 MW3 MW000170 MW043 MW0
2015113 MW0000113 MW000
20162.0 GW00001,997 MW000
2017117 MW5 MW000112 MW000
2018240 MW0000240 MW000
2019324 MW0000324 MW000
2021237 MW1 MW000236 MW000
202248 MW000048 MW000
202354 MW4 MW050 MW00000
20243 MW3 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 76 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2016 with 2.0 GW.

Largest renewable plants in Ecuador

The ten largest operating renewable plants in Ecuador.
#PlantTechnologyCapacityStatusStarted
1Coca Codo Sinclair hydroelectric plantHydropower1.5 GWOperating2016
2Paute Molino hydroelectric plantHydropower1.1 GWOperating1983
3Sopladora hydroelectric plantHydropower487 MWOperating2016
4Minas San Francisco hydroelectric plantHydropower276 MWOperating2019
5San Francisco hydroelectric plant (Ecuador)Hydropower230 MWOperating2007
6Marcel Laniado hydroelectric plantHydropower213 MWOperating1987
7Toachi-Alluriquin hydroelectric plantHydropower204 MWOperating2021
8Delsitanisagua hydroelectric plantHydropower180 MWOperating2018
9Mazàr hydroelectric plantHydropower170 MWOperating2014
10Agoyàn hydroelectric plantHydropower160 MWOperating1987

Largest in the pipeline

The five largest renewable projects under construction or announced in Ecuador.
#PlantTechnologyCapacityStatusStarted
1Zamora G8 hydroelectric plantHydropower3.6 GWAnnounced2028
2Zamora G10 hydroelectric plantHydropower2.0 GWAnnouncednot recorded
3Zamora G9 hydroelectric plantHydropower1.7 GWAnnouncednot recorded
4Cardenillo hydroelectric plantHydropower595 MWAnnounced2030
5Chespí-Palma Real hydroelectric plantHydropower468 MWAnnounced2027

Questions

How much renewable energy capacity does Ecuador have?

Ecuador has 5.5 GW of operating renewable capacity across 54 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Ecuador?

Hydropower, with 5.3 GW operating, which is 96% of Ecuador's operating renewable capacity in the data.

What share of Ecuador's power capacity is renewable?

78% of the operating capacity in this dataset (5.5 GW of 7.1 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Ecuador building renewables?

Operating plants that started from 2015 to 2025 total 3.1 GW, and the biggest single year in the data is 2016 with 2.0 GW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Ecuador?

Coca Codo Sinclair hydroelectric plant, a hydropower plant of 1.5 GW, which started operating in 2016.

How much renewable capacity is being built or planned in Ecuador?

0 MW is under construction and 11.6 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.