Renewable energy in Peru

Peru has 8.5 GW of operating renewable capacity in the data, across 64 plants. Hydropower is the largest source at 5.8 GW (68% of the total). That is 54% of the 15.9 GW of operating power capacity of all kinds that the same tracker lists for Peru (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 4.1 GW, which is 48% of today's operating renewable capacity. A further 819 MW is under construction and 46.2 GW is announced or in pre-construction.

Operating
8.5 GW64 plants
Share of capacity in this dataset
54%of 15.9 GW operating, all kinds
Started 2015 to 2025
4.1 GWoperating plants
Pipeline
47.1 GW819 MW building, 46.2 GW announced

Capacity by technology

Renewable capacity in Peru by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV1.1 GW1713%779 MW22.9 GW
Onshore wind1.4 GW1117%010.7 GW
Hydropower5.8 GW3168%40 MW12.6 GW
Bioenergy134 MW51.6%00
All renewables8.5 GW64100%819 MW46.2 GW

Of the operating solar, 4 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW1.0 GW2.0 GW19901995200020052010201520202025
Solar PVOnshore windHydropowerBioenergy
Show the figures as a table
Operating renewable capacity in Peru by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
1991110 MW0000110 MW000
199738 MW000038 MW000
1999110 MW0000110 MW000
2000267 MW0000267 MW000
2001190 MW0000190 MW000
200415 MW000015 MW000
2005130 MW0000130 MW000
2010220 MW0000220 MW000
2012178 MW88 MW0000090 MW0
2014258 MW20 MW0142 MW096 MW000
2015276 MW0000276 MW000
20161.3 GW0097 MW01,183 MW000
201722 MW00000022 MW0
2018317 MW185 MW0132 MW00000
202037 MW1 MW036 MW00000
202184 MW000084 MW000
2022218 MW3 MW0215 MW00000
2023513 MW00513 MW00000
2024534 MW222 MW0313 MW00000
2025834 MW622 MW000212 MW000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 97 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1973 with 1.6 GW.

Largest renewable plants in Peru

The ten largest operating renewable plants in Peru.
#PlantTechnologyCapacityStatusStarted
1Mantaro hydroelectric plantHydropower798 MWOperating1973
2Santiago Antúnez De Mayolo hydroelectric plantHydropower798 MWOperating1973
3Cerro Del Águila hydroelectric plantHydropower525 MWOperating2016
4Chaglla hydroelectric plantHydropower456 MWOperating2016
5Sunny solar farmSolar PV338 MWOperating2025
6Wayra wind farm (Peru)Onshore wind309 MWOperating2018
7Punta Lomitas wind farmOnshore wind296 MWOperating2023
8Huinco hydroelectric plantHydropower258 MWOperating1964
9San Martín solar farm (Peru)Solar PV252 MWOperating2025
10Cañón Del Pato hydroelectric plantHydropower247 MWOperating1958

Largest in the pipeline

The five largest renewable projects under construction or announced in Peru.
#PlantTechnologyCapacityStatusStarted
1Manseriche hydroelectric plantHydropower7.6 GWAnnounced2034
2Horizonte de Verano solar farmSolar PV5.9 GWAnnounced2027
3La Joya (Phelan) solar farmSolar PV1.8 GWAnnounced2028
4Cumba 4 hydroelectric plantHydropower825 MWAnnounced2034
5Laguna Angel Cruz hydroelectric plantHydropower790 MWAnnounced2034

Questions

How much renewable energy capacity does Peru have?

Peru has 8.5 GW of operating renewable capacity across 64 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Peru?

Hydropower, with 5.8 GW operating, which is 68% of Peru's operating renewable capacity in the data.

What share of Peru's power capacity is renewable?

54% of the operating capacity in this dataset (8.5 GW of 15.9 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Peru building renewables?

Operating plants that started from 2015 to 2025 total 4.1 GW, and the biggest single year in the data is 1973 with 1.6 GW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Peru?

Mantaro hydroelectric plant, a hydropower plant of 798 MW, which started operating in 1973.

How much renewable capacity is being built or planned in Peru?

819 MW is under construction and 46.2 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.