Renewable energy in Suriname
Suriname has 218 MW of operating renewable capacity in the data, across 4 plants. Hydropower is the largest source at 180 MW (83% of the total). That is 50% of the 440 MW of operating power capacity of all kinds that the same tracker lists for Suriname (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 8 MW, which is 3.7% of today's operating renewable capacity. A further 0 MW is under construction and 75 MW is announced or in pre-construction.
- Operating
- 218 MW4 plants
- Share of capacity in this dataset
- 50%of 440 MW operating, all kinds
- Started 2015 to 2025
- 8 MWoperating plants
- Pipeline
- 75 MW0 MW building, 75 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 8 MW | 2 | 3.7% | 0 | 75 MW |
| Hydropower | 180 MW | 1 | 83% | 0 | 0 |
| Bioenergy | 30 MW | 1 | 14% | 0 | 0 |
| All renewables | 218 MW | 4 | 100% | 0 MW | 75 MW |
Of the operating solar, 6 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2008 | 30 MW | 0 | 0 | 0 | 0 | 0 | 0 | 30 MW | 0 |
| 2017 | 6 MW | 6 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2022 | 2 MW | 2 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1965 with 180 MW.
Largest renewable plants in Suriname
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Brokopondo hydroelectric plant | Hydropower | 180 MW | Operating | 1965 |
| 2 | Skeldon power station | Bioenergy | 30 MW | Operating | 2008 |
| 3 | Rosebel solar projectNC | Solar PV | 6 MW | Operating | 2017 |
| 4 | Nickerie solar farm | Solar PV | 2 MW | Operating | 2022 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Staatsolie solar farm | Solar PV | 45 MW | Announced | not recorded |
| 2 | Sarah Maria solar farm | Solar PV | 30 MW | Announced | not recorded |
Questions
How much renewable energy capacity does Suriname have?
Suriname has 218 MW of operating renewable capacity across 4 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Suriname?
Hydropower, with 180 MW operating, which is 83% of Suriname's operating renewable capacity in the data.
What share of Suriname's power capacity is renewable?
50% of the operating capacity in this dataset (218 MW of 440 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Suriname building renewables?
Operating plants that started from 2015 to 2025 total 8 MW, and the biggest single year in the data is 1965 with 180 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Suriname?
Brokopondo hydroelectric plant, a hydropower plant of 180 MW, which started operating in 1965.
How much renewable capacity is being built or planned in Suriname?
0 MW is under construction and 75 MW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.