Renewable energy in Bonaire, Sint Eustatius, and Saba
Bonaire, Sint Eustatius, and Saba has 20 MW of operating renewable capacity in the data, across 2 plants. Onshore wind is the largest source at 11 MW (56% of the total). That is 100% of the 20 MW of operating power capacity of all kinds that the same tracker lists for Bonaire, Sint Eustatius, and Saba (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 9 MW, which is 44% of today's operating renewable capacity. No renewable pipeline is recorded.
- Operating
- 20 MW2 plants
- Share of capacity in this dataset
- 100%of 20 MW operating, all kinds
- Started 2015 to 2025
- 9 MWoperating plants
- Pipeline
- None recorded0 MW building, 0 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 9 MW | 1 | 44% | 0 | 0 |
| Onshore wind | 11 MW | 1 | 56% | 0 | 0 |
| All renewables | 20 MW | 2 | 100% | 0 MW | 0 MW |
Of the operating solar, 9 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2013 | 11 MW | 0 | 0 | 11 MW | 0 | 0 | 0 | 0 | 0 |
| 2023 | 9 MW | 9 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2013 with 11 MW.
Largest renewable plants in Bonaire, Sint Eustatius, and Saba
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Bonaire wind farm | Onshore wind | 11 MW | Operating | 2013 |
| 2 | Sint Eustatius solar projectNC | Solar PV | 9 MW | Operating | 2023 |
Questions
How much renewable energy capacity does Bonaire, Sint Eustatius, and Saba have?
Bonaire, Sint Eustatius, and Saba has 20 MW of operating renewable capacity across 2 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Bonaire, Sint Eustatius, and Saba?
Onshore wind, with 11 MW operating, which is 56% of Bonaire, Sint Eustatius, and Saba's operating renewable capacity in the data.
What share of Bonaire, Sint Eustatius, and Saba's power capacity is renewable?
100% of the operating capacity in this dataset (20 MW of 20 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Bonaire, Sint Eustatius, and Saba building renewables?
Operating plants that started from 2015 to 2025 total 9 MW, and the biggest single year in the data is 2013 with 11 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Bonaire, Sint Eustatius, and Saba?
Bonaire wind farm, a onshore wind plant of 11 MW, which started operating in 2013.
How much renewable capacity is being built or planned in Bonaire, Sint Eustatius, and Saba?
No renewable pipeline is recorded for Bonaire, Sint Eustatius, and Saba.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.