Renewable energy in Bermuda

Bermuda has 6 MW of operating renewable capacity in the data, across 1 plants. Solar PV is the largest source at 6 MW (100% of the total). That is 5.0% of the 120 MW of operating power capacity of all kinds that the same tracker lists for Bermuda (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 6 MW, which is 100% of today's operating renewable capacity. A further 0 MW is under construction and 130 MW is announced or in pre-construction.

Operating
6 MW1 plants
Share of capacity in this dataset
5.0%of 120 MW operating, all kinds
Started 2015 to 2025
6 MWoperating plants
Pipeline
130 MW0 MW building, 130 MW announced

Capacity by technology

Renewable capacity in Bermuda by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV6 MW1100%010 MW
Offshore wind000.0%0120 MW
All renewables6 MW1100%0 MW130 MW

The build-out by year

0 MW5 MW10 MW19901995200020052010201520202025
Solar PV
Show the figures as a table
Operating renewable capacity in Bermuda by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
20216 MW6 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2021 with 6 MW.

Largest renewable plants in Bermuda

The ten largest operating renewable plants in Bermuda.
#PlantTechnologyCapacityStatusStarted
1Airport Finger solar farmSolar PV6 MWOperating2021

Largest in the pipeline

The five largest renewable projects under construction or announced in Bermuda.
#PlantTechnologyCapacityStatusStarted
1Bermuda Offshore Wind ProjectOffshore wind120 MWAnnounced2030
2Bermuda Floating PV solar projectSolar PV10 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Bermuda have?

Bermuda has 6 MW of operating renewable capacity across 1 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Bermuda?

Solar PV, with 6 MW operating, which is 100% of Bermuda's operating renewable capacity in the data.

What share of Bermuda's power capacity is renewable?

5.0% of the operating capacity in this dataset (6 MW of 120 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Bermuda building renewables?

Operating plants that started from 2015 to 2025 total 6 MW, and the biggest single year in the data is 2021 with 6 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Bermuda?

Airport Finger solar farm, a solar pv plant of 6 MW, which started operating in 2021.

How much renewable capacity is being built or planned in Bermuda?

0 MW is under construction and 130 MW is announced or in pre-construction. Some announced projects will never be built.

Does Bermuda have offshore wind?

Yes: 0 MW operating, 0 MW under construction and 120 MW announced or in pre-construction.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.