Belize has 32 MW of operating renewable capacity in the data, across 4 plants. Bioenergy is the largest source at 28 MW (87% of the total). That is 100% of the 32 MW of operating power capacity of all kinds that the same tracker lists for Belize (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 4 MW, which is 13% of today's operating renewable capacity. A further 0 MW is under construction and 60 MW is announced or in pre-construction.
- Operating
- 32 MW4 plants
- Share of capacity in this dataset
- 100%of 32 MW operating, all kinds
- Started 2015 to 2025
- 4 MWoperating plants
- Pipeline
- 60 MW0 MW building, 60 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 4 MW | 3 | 13% | 0 | 60 MW |
| Bioenergy | 28 MW | 1 | 87% | 0 | 0 |
| All renewables | 32 MW | 4 | 100% | 0 MW | 60 MW |
Of the operating solar, 4 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2009 | 28 MW | 0 | 0 | 0 | 0 | 0 | 0 | 28 MW | 0 |
| 2021 | 1 MW | 1 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2022 | 1 MW | 1 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2023 | 2 MW | 2 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2009 with 28 MW.
Largest renewable plants in Belize
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Belcogen power station | Bioenergy | 28 MW | Operating | 2009 |
| 2 | Stann Creek solar project INC | Solar PV | 2 MW | Operating | 2023 |
| 3 | Cayo District solar projectNC | Solar PV | 1 MW | Operating | 2022 |
| 4 | Stann Creek solar project IINC | Solar PV | 1 MW | Operating | 2021 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Belize 60 MW solar farm | Solar PV | 60 MW | Announced | not recorded |
Questions
How much renewable energy capacity does Belize have?
Belize has 32 MW of operating renewable capacity across 4 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Belize?
Bioenergy, with 28 MW operating, which is 87% of Belize's operating renewable capacity in the data.
What share of Belize's power capacity is renewable?
100% of the operating capacity in this dataset (32 MW of 32 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Belize building renewables?
Operating plants that started from 2015 to 2025 total 4 MW, and the biggest single year in the data is 2009 with 28 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Belize?
Belcogen power station, a bioenergy plant of 28 MW, which started operating in 2009.
How much renewable capacity is being built or planned in Belize?
0 MW is under construction and 60 MW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.