Renewable energy in Uganda

Uganda has 1.7 GW of operating renewable capacity in the data, across 21 plants. Hydropower is the largest source at 1.5 GW (88% of the total). That is 90% of the 1.9 GW of operating power capacity of all kinds that the same tracker lists for Uganda (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 988 MW, which is 58% of today's operating renewable capacity. A further 24 MW is under construction and 2.5 GW is announced or in pre-construction.

Operating
1.7 GW21 plants
Share of capacity in this dataset
90%of 1.9 GW operating, all kinds
Started 2015 to 2025
988 MWoperating plants
Pipeline
2.6 GW24 MW building, 2.5 GW announced

Capacity by technology

Renewable capacity in Uganda by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV121 MW107.1%24 MW610 MW
Concentrated solar000.0%050 MW
Onshore wind000.0%0130 MW
Hydropower1.5 GW788%01.7 GW
Bioenergy87 MW45.1%075 MW
All renewables1.7 GW21100%24 MW2.5 GW

Of the operating solar, 74 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW500 MW1.0 GW19901995200020052010201520202025
Solar PVHydropowerBioenergy
Show the figures as a table
Operating renewable capacity in Uganda by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
2003200 MW0000200 MW000
2012250 MW0000250 MW000
201312 MW00000012 MW0
201430 MW00000030 MW0
201820 MW20 MW0000000
2019221 MW38 MW000183 MW000
202015 MW15 MW0000000
202188 MW4 MW00084 MW000
2023644 MW44 MW000600 MW000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 45 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2023 with 644 MW.

Largest renewable plants in Uganda

The ten largest operating renewable plants in Uganda.
#PlantTechnologyCapacityStatusStarted
1Karuma hydroelectric plantHydropower600 MWOperating2023
2Bujagali hydroelectric plantHydropower250 MWOperating2012
3Kiira hydroelectric plantHydropower200 MWOperating2003
4Isimba hydroelectric plantHydropower183 MWOperating2019
5Nalubaale hydroelectric plantHydropower180 MWOperating1954
6Achwa I hydroelectric plantHydropower42 MWOperating2021
7Achwa II hydroelectric plantHydropower42 MWOperating2021
8Lugazi Sugar power stationBioenergy36 MWOperatingnot recorded
9Kakira Sugar power stationBioenergy30 MWOperating2014
10Kabulasoke solar farmSolar PV24 MWOperating2019

Largest in the pipeline

The five largest renewable projects under construction or announced in Uganda.
#PlantTechnologyCapacityStatusStarted
1Ayago hydroelectric plantHydropower840 MWAnnouncednot recorded
2Kiba hydroelectric plantHydropower400 MWAnnouncednot recorded
3Oriang hydroelectric plantHydropower392 MWAnnouncednot recorded
4Kween solar farmSolar PV150 MWAnnouncednot recorded
5Uganda (Masdar) solar farmSolar PV150 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Uganda have?

Uganda has 1.7 GW of operating renewable capacity across 21 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Uganda?

Hydropower, with 1.5 GW operating, which is 88% of Uganda's operating renewable capacity in the data.

What share of Uganda's power capacity is renewable?

90% of the operating capacity in this dataset (1.7 GW of 1.9 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Uganda building renewables?

Operating plants that started from 2015 to 2025 total 988 MW, and the biggest single year in the data is 2023 with 644 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Uganda?

Karuma hydroelectric plant, a hydropower plant of 600 MW, which started operating in 2023.

How much renewable capacity is being built or planned in Uganda?

24 MW is under construction and 2.5 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.