Renewable energy in Côte d'Ivoire
Côte d'Ivoire has 1.1 GW of operating renewable capacity in the data, across 8 plants. Hydropower is the largest source at 966 MW (92% of the total). That is 39% of the 2.7 GW of operating power capacity of all kinds that the same tracker lists for Côte d'Ivoire (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 425 MW, which is 41% of today's operating renewable capacity. A further 268 MW is under construction and 1.3 GW is announced or in pre-construction.
- Operating
- 1.1 GW8 plants
- Share of capacity in this dataset
- 39%of 2.7 GW operating, all kinds
- Started 2015 to 2025
- 425 MWoperating plants
- Pipeline
- 1.6 GW268 MW building, 1.3 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 38 MW | 1 | 3.6% | 224 MW | 783 MW |
| Hydropower | 966 MW | 6 | 92% | 44 MW | 402 MW |
| Bioenergy | 46 MW | 1 | 4.4% | 0 | 101 MW |
| All renewables | 1.1 GW | 8 | 100% | 268 MW | 1.3 GW |
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2017 | 275 MW | 0 | 0 | 0 | 0 | 275 MW | 0 | 0 | 0 |
| 2022 | 38 MW | 38 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2024 | 112 MW | 0 | 0 | 0 | 0 | 112 MW | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2017 with 275 MW.
Largest renewable plants in Côte d'Ivoire
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Soubre hydroelectric plant | Hydropower | 275 MW | Operating | 2017 |
| 2 | Taabo hydroelectric plant | Hydropower | 210 MW | Operating | 1979 |
| 3 | Kossou hydroelectric plant | Hydropower | 174 MW | Operating | 1972 |
| 4 | Buyo hydroelectric plant | Hydropower | 165 MW | Operating | 1980 |
| 5 | Gribo-Popoli hydroelectric plant | Hydropower | 112 MW | Operating | 2024 |
| 6 | Biokala power station | Bioenergy | 46 MW | Operating | 2026 |
| 7 | Boundiali solar farm | Solar PV | 38 MW | Operating | 2022 |
| 8 | Ayame II hydroelectric plant | Hydropower | 30 MW | Operating | 1965 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Boutoubre hydroelectric plant | Hydropower | 156 MW | Announced | not recorded |
| 2 | Louga 1 hydroelectric plant | Hydropower | 126 MW | Announced | not recorded |
| 3 | Louga 2 hydroelectric plant | Hydropower | 120 MW | Announced | 2027 |
| 4 | Korhogo solar farm | Solar PV | 116 MW | Announced | 2026 |
| 5 | Dabakala solar farm | Solar PV | 100 MW | Announced | not recorded |
Questions
How much renewable energy capacity does Côte d'Ivoire have?
Côte d'Ivoire has 1.1 GW of operating renewable capacity across 8 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Côte d'Ivoire?
Hydropower, with 966 MW operating, which is 92% of Côte d'Ivoire's operating renewable capacity in the data.
What share of Côte d'Ivoire's power capacity is renewable?
39% of the operating capacity in this dataset (1.1 GW of 2.7 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Côte d'Ivoire building renewables?
Operating plants that started from 2015 to 2025 total 425 MW, and the biggest single year in the data is 2017 with 275 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Côte d'Ivoire?
Soubre hydroelectric plant, a hydropower plant of 275 MW, which started operating in 2017.
How much renewable capacity is being built or planned in Côte d'Ivoire?
268 MW is under construction and 1.3 GW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.