Renewable energy in Mozambique

Mozambique has 2.3 GW of operating renewable capacity in the data, across 7 plants. Hydropower is the largest source at 2.2 GW (95% of the total). That is 78% of the 2.9 GW of operating power capacity of all kinds that the same tracker lists for Mozambique (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 111 MW, which is 4.9% of today's operating renewable capacity. A further 120 MW is under construction and 17.3 GW is announced or in pre-construction.

Operating
2.3 GW7 plants
Share of capacity in this dataset
78%of 2.9 GW operating, all kinds
Started 2015 to 2025
111 MWoperating plants
Pipeline
17.5 GW120 MW building, 17.3 GW announced

Capacity by technology

Renewable capacity in Mozambique by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV111 MW44.9%013.6 GW
Onshore wind000.0%120 MW0
Hydropower2.2 GW395%03.7 GW
Wind (type not stated)000.0%030 MW
All renewables2.3 GW7100%120 MW17.3 GW

Of the operating solar, 30 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW25 MW50 MW19901995200020052010201520202025
Solar PVHydropower
Show the figures as a table
Operating renewable capacity in Mozambique by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
201940 MW40 MW0000000
202241 MW41 MW0000000
202330 MW30 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1974 with 2.1 GW.

Largest renewable plants in Mozambique

The ten largest operating renewable plants in Mozambique.
#PlantTechnologyCapacityStatusStarted
1Cahora Bassa hydroelectric plantHydropower2.1 GWOperating1974
2Mavuzi hydroelectric plantHydropower52 MWOperating1957
3Chicamba hydroelectric plantHydropower44 MWOperating1968
4Metoro Substation solar farmSolar PV41 MWOperating2022
5Mocuba solar farmSolar PV40 MWOperating2019
6Cuamba solar farmNCSolar PV19 MWOperating2023
7Balama Graphite Mine solar farmNCSolar PV11 MWOperating2023

Largest in the pipeline

The five largest renewable projects under construction or announced in Mozambique.
#PlantTechnologyCapacityStatusStarted
1JER Green Hydrogen Solar PV Project (Mozambique)Solar PV12.0 GWAnnounced2028
2Mphanda Nkuwa hydroelectric plantHydropower1.5 GWAnnounced2031
3Chemba I hydroelectric plantHydropower600 MWAnnounced2027
4Lupata hydroelectric plantHydropower600 MWAnnounced2027
5Cahora Bassa solar farmSolar PV400 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Mozambique have?

Mozambique has 2.3 GW of operating renewable capacity across 7 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Mozambique?

Hydropower, with 2.2 GW operating, which is 95% of Mozambique's operating renewable capacity in the data.

What share of Mozambique's power capacity is renewable?

78% of the operating capacity in this dataset (2.3 GW of 2.9 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Mozambique building renewables?

Operating plants that started from 2015 to 2025 total 111 MW, and the biggest single year in the data is 1974 with 2.1 GW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Mozambique?

Cahora Bassa hydroelectric plant, a hydropower plant of 2.1 GW, which started operating in 1974.

How much renewable capacity is being built or planned in Mozambique?

120 MW is under construction and 17.3 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.