Renewable energy in French Guiana
French Guiana has 184 MW of operating renewable capacity in the data, across 15 plants. Hydropower is the largest source at 116 MW (63% of the total). That is 56% of the 329 MW of operating power capacity of all kinds that the same tracker lists for French Guiana (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 41 MW, which is 22% of today's operating renewable capacity. A further 222 MW is under construction and 0 MW is announced or in pre-construction.
- Operating
- 184 MW15 plants
- Share of capacity in this dataset
- 56%of 329 MW operating, all kinds
- Started 2015 to 2025
- 41 MWoperating plants
- Pipeline
- 222 MW222 MW building, 0 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 42 MW | 9 | 23% | 102 MW | 0 |
| Hydropower | 116 MW | 1 | 63% | 0 | 0 |
| Bioenergy | 26 MW | 5 | 14% | 120 MW | 0 |
| All renewables | 184 MW | 15 | 100% | 222 MW | 0 MW |
Of the operating solar, 5 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 1994 | 116 MW | 0 | 0 | 0 | 0 | 116 MW | 0 | 0 | 0 |
| 2009 | 2 MW | 0 | 0 | 0 | 0 | 0 | 0 | 2 MW | 0 |
| 2010 | 12 MW | 12 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2011 | 8 MW | 8 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2014 | 5 MW | 5 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2017 | 5 MW | 5 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2020 | 10 MW | 5 MW | 0 | 0 | 0 | 0 | 0 | 5 MW | 0 |
| 2021 | 3 MW | 0 | 0 | 0 | 0 | 0 | 0 | 3 MW | 0 |
| 2023 | 11 MW | 5 MW | 0 | 0 | 0 | 0 | 0 | 6 MW | 0 |
| 2024 | 1 MW | 1 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2025 | 11 MW | 0 | 0 | 0 | 0 | 0 | 0 | 11 MW | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1994 with 116 MW.
Largest renewable plants in French Guiana
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Petit Saut hydroelectric plant | Hydropower | 116 MW | Operating | 1994 |
| 2 | Kourou solar farm | Solar PV | 12 MW | Operating | 2010 |
| 3 | Sinnamary power station | Bioenergy | 11 MW | Operating | 2025 |
| 4 | Toucan solar farm | Solar PV | 10 MW | Operating | 2014 |
| 5 | Montsinéry biomass power station | Bioenergy | 6 MW | Operating | 2023 |
| 6 | Cacao biomass power station | Bioenergy | 5 MW | Operating | 2020 |
| 7 | Sable Blanc solar farm | Solar PV | 5 MW | Operating | 2023 |
| 8 | French Guiana solar project IVNC | Solar PV | 4 MW | Operating | 2017 |
| 9 | Matoury solar farm | Solar PV | 4 MW | Operating | 2011 |
| 10 | Saint-George biomass power station | Bioenergy | 3 MW | Operating | 2021 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Larivot Bioenergy power station | Bioenergy | 120 MW | Under construction | 2026 |
| 2 | Centrale Électrique De L'Ouest Guyanais (Ceog) solar farm | Solar PV | 55 MW | Under construction | not recorded |
| 3 | Sainte-Anne Hybrid solar farm | Solar PV | 43 MW | Under construction | 2028 |
| 4 | Kourou Space Base solar farm | Solar PV | 4 MW | Under construction | not recorded |
Questions
How much renewable energy capacity does French Guiana have?
French Guiana has 184 MW of operating renewable capacity across 15 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in French Guiana?
Hydropower, with 116 MW operating, which is 63% of French Guiana's operating renewable capacity in the data.
What share of French Guiana's power capacity is renewable?
56% of the operating capacity in this dataset (184 MW of 329 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is French Guiana building renewables?
Operating plants that started from 2015 to 2025 total 41 MW, and the biggest single year in the data is 1994 with 116 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in French Guiana?
Petit Saut hydroelectric plant, a hydropower plant of 116 MW, which started operating in 1994.
How much renewable capacity is being built or planned in French Guiana?
222 MW is under construction and 0 MW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.