Renewable energy in North Macedonia

North Macedonia has 1.0 GW of operating renewable capacity in the data, across 99 plants. Hydropower is the largest source at 524 MW (51% of the total). That is 46% of the 2.3 GW of operating power capacity of all kinds that the same tracker lists for North Macedonia (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 513 MW, which is 50% of today's operating renewable capacity. A further 592 MW is under construction and 1.4 GW is announced or in pre-construction.

Operating
1.0 GW99 plants
Share of capacity in this dataset
46%of 2.3 GW operating, all kinds
Started 2015 to 2025
513 MWoperating plants
Pipeline
2.0 GW592 MW building, 1.4 GW announced

Capacity by technology

Renewable capacity in North Macedonia by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV440 MW9142%119 MW1.0 GW
Onshore wind73 MW27.0%473 MW14 MW
Hydropower524 MW651%0342 MW
All renewables1.0 GW99100%592 MW1.4 GW

Of the operating solar, 368 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW250 MW500 MW19901995200020052010201520202025
Solar PVOnshore windHydropower
Show the figures as a table
Operating renewable capacity in North Macedonia by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
200482 MW000082 MW000
201236 MW000036 MW000
201537 MW0037 MW00000
201748 MW48 MW0000000
20192 MW2 MW0000000
202115 MW15 MW0000000
202266 MW66 MW0000000
2023263 MW227 MW036 MW00000
202484 MW84 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2023 with 263 MW.

Largest renewable plants in North Macedonia

The ten largest operating renewable plants in North Macedonia.
#PlantTechnologyCapacityStatusStarted
1Vrutok hydroelectric plantHydropower166 MWOperating1957
2Tikveš hydroelectric plantHydropower114 MWOperating1966
3Spilje hydroelectric plantHydropower84 MWOperating1969
4Kozjak hydroelectric plant (North Macedonia)Hydropower82 MWOperating2004
5Novaci solar farmSolar PV55 MWOperating2023
6Globocica hydroelectric plantHydropower42 MWOperating1965
7Bogdanci (ESM) wind farmOnshore wind37 MWOperating2015
8Bogoslovec wind farmOnshore wind36 MWOperating2023
9Sveta Petka hydroelectric plantHydropower36 MWOperating2012
10Southeastern Region solar project IINCSolar PV18 MWOperating2017

Largest in the pipeline

The five largest renewable projects under construction or announced in North Macedonia.
#PlantTechnologyCapacityStatusStarted
1Stipion solar farmSolar PV600 MWAnnouncednot recorded
2Štip wind farmOnshore wind400 MWUnder constructionnot recorded
3Galiste hydroelectric plantHydropower194 MWAnnouncednot recorded
4AIM Green Tech solar farmSolar PV150 MWAnnouncednot recorded
5Oslomej solar farmSolar PV119 MWUnder constructionnot recorded

Questions

How much renewable energy capacity does North Macedonia have?

North Macedonia has 1.0 GW of operating renewable capacity across 99 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in North Macedonia?

Hydropower, with 524 MW operating, which is 51% of North Macedonia's operating renewable capacity in the data.

What share of North Macedonia's power capacity is renewable?

46% of the operating capacity in this dataset (1.0 GW of 2.3 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is North Macedonia building renewables?

Operating plants that started from 2015 to 2025 total 513 MW, and the biggest single year in the data is 2023 with 263 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in North Macedonia?

Vrutok hydroelectric plant, a hydropower plant of 166 MW, which started operating in 1957.

How much renewable capacity is being built or planned in North Macedonia?

592 MW is under construction and 1.4 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.