Renewable energy in Montenegro

Montenegro has 477 MW of operating renewable capacity in the data, across 7 plants. Hydropower is the largest source at 342 MW (72% of the total). That is 47% of the 1.0 GW of operating power capacity of all kinds that the same tracker lists for Montenegro (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 135 MW, which is 28% of today's operating renewable capacity. A further 64 MW is under construction and 3.7 GW is announced or in pre-construction.

Operating
477 MW7 plants
Share of capacity in this dataset
47%of 1.0 GW operating, all kinds
Started 2015 to 2025
135 MWoperating plants
Pipeline
3.8 GW64 MW building, 3.7 GW announced

Capacity by technology

Renewable capacity in Montenegro by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV17 MW43.5%9 MW3.0 GW
Onshore wind118 MW225%55 MW239 MW
Hydropower342 MW172%0542 MW
All renewables477 MW7100%64 MW3.7 GW

Of the operating solar, 8 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW50 MW100 MW19901995200020052010201520202025
Solar PVOnshore windHydropower
Show the figures as a table
Operating renewable capacity in Montenegro by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
201772 MW0072 MW00000
201946 MW0046 MW00000
20236 MW6 MW0000000
202411 MW11 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1976 with 342 MW.

Largest renewable plants in Montenegro

The ten largest operating renewable plants in Montenegro.
#PlantTechnologyCapacityStatusStarted
1Mratinje hydroelectric plantHydropower342 MWOperating1976
2Krnovo wind farmOnshore wind72 MWOperating2017
3Možura wind farmOnshore wind46 MWOperating2019
4Podgorica Capital City solar projectSolar PV9 MWOperating2024
5Old Royal Capital Cetinje solar projectNCSolar PV5 MWOperating2023
6Podgorica Podgorica Capital City solar project IINCSolar PV2 MWOperating2024
7Podgorica Podgorica Capital City solar project INCSolar PV1 MWOperating2023

Largest in the pipeline

The five largest renewable projects under construction or announced in Montenegro.
#PlantTechnologyCapacityStatusStarted
1Lastva-Ubli solar farmSolar PV506 MWAnnouncednot recorded
2Montečevo solar farmSolar PV400 MWAnnounced2026
3Čevo solar farmSolar PV385 MWAnnounced2027
4Boka hydroelectric plantHydropower250 MWAnnouncednot recorded
5Korita solar farmSolar PV240 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Montenegro have?

Montenegro has 477 MW of operating renewable capacity across 7 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Montenegro?

Hydropower, with 342 MW operating, which is 72% of Montenegro's operating renewable capacity in the data.

What share of Montenegro's power capacity is renewable?

47% of the operating capacity in this dataset (477 MW of 1.0 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Montenegro building renewables?

Operating plants that started from 2015 to 2025 total 135 MW, and the biggest single year in the data is 1976 with 342 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Montenegro?

Mratinje hydroelectric plant, a hydropower plant of 342 MW, which started operating in 1976.

How much renewable capacity is being built or planned in Montenegro?

64 MW is under construction and 3.7 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.