Renewable energy in Montenegro
Montenegro has 477 MW of operating renewable capacity in the data, across 7 plants. Hydropower is the largest source at 342 MW (72% of the total). That is 47% of the 1.0 GW of operating power capacity of all kinds that the same tracker lists for Montenegro (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 135 MW, which is 28% of today's operating renewable capacity. A further 64 MW is under construction and 3.7 GW is announced or in pre-construction.
- Operating
- 477 MW7 plants
- Share of capacity in this dataset
- 47%of 1.0 GW operating, all kinds
- Started 2015 to 2025
- 135 MWoperating plants
- Pipeline
- 3.8 GW64 MW building, 3.7 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 17 MW | 4 | 3.5% | 9 MW | 3.0 GW |
| Onshore wind | 118 MW | 2 | 25% | 55 MW | 239 MW |
| Hydropower | 342 MW | 1 | 72% | 0 | 542 MW |
| All renewables | 477 MW | 7 | 100% | 64 MW | 3.7 GW |
Of the operating solar, 8 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2017 | 72 MW | 0 | 0 | 72 MW | 0 | 0 | 0 | 0 | 0 |
| 2019 | 46 MW | 0 | 0 | 46 MW | 0 | 0 | 0 | 0 | 0 |
| 2023 | 6 MW | 6 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2024 | 11 MW | 11 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1976 with 342 MW.
Largest renewable plants in Montenegro
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Mratinje hydroelectric plant | Hydropower | 342 MW | Operating | 1976 |
| 2 | Krnovo wind farm | Onshore wind | 72 MW | Operating | 2017 |
| 3 | Možura wind farm | Onshore wind | 46 MW | Operating | 2019 |
| 4 | Podgorica Capital City solar project | Solar PV | 9 MW | Operating | 2024 |
| 5 | Old Royal Capital Cetinje solar projectNC | Solar PV | 5 MW | Operating | 2023 |
| 6 | Podgorica Podgorica Capital City solar project IINC | Solar PV | 2 MW | Operating | 2024 |
| 7 | Podgorica Podgorica Capital City solar project INC | Solar PV | 1 MW | Operating | 2023 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Lastva-Ubli solar farm | Solar PV | 506 MW | Announced | not recorded |
| 2 | Montečevo solar farm | Solar PV | 400 MW | Announced | 2026 |
| 3 | Čevo solar farm | Solar PV | 385 MW | Announced | 2027 |
| 4 | Boka hydroelectric plant | Hydropower | 250 MW | Announced | not recorded |
| 5 | Korita solar farm | Solar PV | 240 MW | Announced | not recorded |
Questions
How much renewable energy capacity does Montenegro have?
Montenegro has 477 MW of operating renewable capacity across 7 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Montenegro?
Hydropower, with 342 MW operating, which is 72% of Montenegro's operating renewable capacity in the data.
What share of Montenegro's power capacity is renewable?
47% of the operating capacity in this dataset (477 MW of 1.0 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Montenegro building renewables?
Operating plants that started from 2015 to 2025 total 135 MW, and the biggest single year in the data is 1976 with 342 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Montenegro?
Mratinje hydroelectric plant, a hydropower plant of 342 MW, which started operating in 1976.
How much renewable capacity is being built or planned in Montenegro?
64 MW is under construction and 3.7 GW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.