Renewable energy in Nicaragua

Nicaragua has 662 MW of operating renewable capacity in the data, across 27 plants. Onshore wind is the largest source at 189 MW (29% of the total). That is 64% of the 1.0 GW of operating power capacity of all kinds that the same tracker lists for Nicaragua (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 148 MW, which is 22% of today's operating renewable capacity. A further 176 MW is under construction and 646 MW is announced or in pre-construction.

Operating
662 MW27 plants
Share of capacity in this dataset
64%of 1.0 GW operating, all kinds
Started 2015 to 2025
148 MWoperating plants
Pipeline
821 MW176 MW building, 646 MW announced

Capacity by technology

Renewable capacity in Nicaragua by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV59 MW158.9%176 MW237 MW
Onshore wind189 MW429%055 MW
Hydropower104 MW216%0353 MW
Geothermal159 MW224%00
Bioenergy151 MW423%00
All renewables662 MW27100%176 MW646 MW

Of the operating solar, 37 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW100 MW200 MW19901995200020052010201520202025
Solar PVOnshore windHydropowerGeothermalBioenergy
Show the figures as a table
Operating renewable capacity in Nicaragua by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
200015 MW00000015 MW0
200940 MW0040 MW00000
201023 MW0023 MW00000
201244 MW0044 MW00000
2013155 MW1 MW082 MW0072 MW00
201642 MW00000042 MW0
201717 MW17 MW0000000
20181 MW1 MW0000000
201942 MW2 MW0000040 MW0
20211 MW1 MW0000000
20222 MW2 MW0000000
202325 MW14 MW000010 MW00
202417 MW17 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 63 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2013 with 155 MW.

Largest renewable plants in Nicaragua

The ten largest operating renewable plants in Nicaragua.
#PlantTechnologyCapacityStatusStarted
1San Jacinto - Tizate geothermal power plantGeothermal82 MWOperating2013
2Momotombo geothermal power plantGeothermal76 MWOperating1983
3Amayo wind farmOnshore wind63 MWOperating2009
4Carlos Fonesca hydroelectric plantHydropower54 MWOperating1970
5Ingenio Monte Rosa power stationBioenergy54 MWOperatingnot recorded
6Centroamérica hydroelectric plantHydropower50 MWOperating1964
7Eolo De Nicaragua Wind FacilityOnshore wind44 MWOperating2012
8Alba Rivas wind farmOnshore wind42 MWOperating2013
9Ingenio Montelimar power stationBioenergy42 MWOperating2016
10La Fe wind farmOnshore wind40 MWOperating2013

Largest in the pipeline

The five largest renewable projects under construction or announced in Nicaragua.
#PlantTechnologyCapacityStatusStarted
1Copalar Bajo hydroelectric plantHydropower150 MWAnnounced2028
2Mojolka hydroelectric plantHydropower120 MWAnnounced2027
3Puerto Sandino solar farmSolar PV100 MWAnnounced2026
4El Carmen hydroelectric plantHydropower83 MWAnnounced2029
5Enesolar 3 solar farmSolar PV70 MWUnder construction2026

Questions

How much renewable energy capacity does Nicaragua have?

Nicaragua has 662 MW of operating renewable capacity across 27 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Nicaragua?

Onshore wind, with 189 MW operating, which is 29% of Nicaragua's operating renewable capacity in the data.

What share of Nicaragua's power capacity is renewable?

64% of the operating capacity in this dataset (662 MW of 1.0 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Nicaragua building renewables?

Operating plants that started from 2015 to 2025 total 148 MW, and the biggest single year in the data is 2013 with 155 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Nicaragua?

San Jacinto - Tizate geothermal power plant, a geothermal plant of 82 MW, which started operating in 2013.

How much renewable capacity is being built or planned in Nicaragua?

176 MW is under construction and 646 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.