Cuba has 936 MW of operating renewable capacity in the data, across 91 plants. Solar PV is the largest source at 864 MW (92% of the total). That is 40% of the 2.4 GW of operating power capacity of all kinds that the same tracker lists for Cuba (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 903 MW, which is 97% of today's operating renewable capacity. A further 199 MW is under construction and 1.6 GW is announced or in pre-construction.

Operating
936 MW91 plants
Share of capacity in this dataset
40%of 2.4 GW operating, all kinds
Started 2015 to 2025
903 MWoperating plants
Pipeline
1.8 GW199 MW building, 1.6 GW announced

Capacity by technology

Renewable capacity in Cuba by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV864 MW8892%66 MW977 MW
Onshore wind11 MW21.2%133 MW608 MW
Bioenergy60 MW16.4%00
All renewables936 MW91100%199 MW1.6 GW

Of the operating solar, 248 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW500 MW1.0 GW19901995200020052010201520202025
Solar PVOnshore windBioenergy
Show the figures as a table
Operating renewable capacity in Cuba by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
20072 MW002 MW00000
20085 MW005 MW00000
20105 MW005 MW00000
201789 MW89 MW0000000
201867 MW67 MW0000000
201922 MW22 MW0000000
202011 MW11 MW0000000
2021122 MW62 MW0000060 MW0
20225 MW5 MW0000000
202371 MW71 MW0000000
202412 MW12 MW0000000
2025505 MW505 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2025 with 505 MW.

Largest renewable plants in Cuba

The ten largest operating renewable plants in Cuba.
#PlantTechnologyCapacityStatusStarted
1Mariel solar farmSolar PV62 MWOperating2021
2Ciro Redondo power stationBioenergy60 MWOperating2021
3Luaces solar farmSolar PV24 MWOperating2025
4TBD Guajaibón solar farmSolar PV23 MWOperating2023
5Alcalde Mayor solar farmSolar PV22 MWOperating2025
6Cabaiguán solar farmSolar PV22 MWOperating2025
7Calabazar de Sagua solar farmSolar PV22 MWOperating2025
8Cruce de la Trocha solar farmSolar PV22 MWOperating2025
9El Rincón solar farmSolar PV22 MWOperating2025
10Escuela de Enfermería solar farmSolar PV22 MWOperating2025

Largest in the pipeline

The five largest renewable projects under construction or announced in Cuba.
#PlantTechnologyCapacityStatusStarted
1Program-06 ISA solar farmSolar PV785 MWAnnounced2030
2TBD Guajaibón solar farmSolar PV127 MWAnnouncednot recorded
3Manatí wind farmOnshore wind122 MWAnnouncednot recorded
4Rio Seco wind farmOnshore wind96 MWAnnouncednot recorded
5Punta Fraile wind farmOnshore wind88 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Cuba have?

Cuba has 936 MW of operating renewable capacity across 91 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Cuba?

Solar PV, with 864 MW operating, which is 92% of Cuba's operating renewable capacity in the data.

What share of Cuba's power capacity is renewable?

40% of the operating capacity in this dataset (936 MW of 2.4 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Cuba building renewables?

Operating plants that started from 2015 to 2025 total 903 MW, and the biggest single year in the data is 2025 with 505 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Cuba?

Mariel solar farm, a solar pv plant of 62 MW, which started operating in 2021.

How much renewable capacity is being built or planned in Cuba?

199 MW is under construction and 1.6 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.