Renewable energy in Guadeloupe

Guadeloupe has 195 MW of operating renewable capacity in the data, across 19 plants. Bioenergy is the largest source at 102 MW (52% of the total). That is 40% of the 487 MW of operating power capacity of all kinds that the same tracker lists for Guadeloupe (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 78 MW, which is 40% of today's operating renewable capacity. A further 0 MW is under construction and 10 MW is announced or in pre-construction.

Operating
195 MW19 plants
Share of capacity in this dataset
40%of 487 MW operating, all kinds
Started 2015 to 2025
78 MWoperating plants
Pipeline
10 MW0 MW building, 10 MW announced

Capacity by technology

Renewable capacity in Guadeloupe by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV37 MW1419%00
Onshore wind41 MW321%00
Geothermal15 MW17.7%010 MW
Bioenergy102 MW152%00
All renewables195 MW19100%0 MW10 MW

Of the operating solar, 32 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW50 MW100 MW19901995200020052010201520202025
Solar PVOnshore windGeothermalBioenergy
Show the figures as a table
Operating renewable capacity in Guadeloupe by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
199864 MW00000064 MW0
200310 MW0000010 MW00
201138 MW00000038 MW0
201721 MW21 MW0000000
201820 MW4 MW016 MW00000
201922 MW10 MW012 MW00000
202013 MW0013 MW00000
20243 MW3 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1998 with 64 MW.

Largest renewable plants in Guadeloupe

The ten largest operating renewable plants in Guadeloupe.
#PlantTechnologyCapacityStatusStarted
1Le Moule Power StationBioenergy102 MWOperating1998
2Sainte-Rose wind farm (Guadeloupe)Onshore wind16 MWOperating2018
3Bouillante geothermal power plantGeothermal15 MWOperating1986
4Fonds Caraïbes wind farmOnshore wind13 MWOperating2020
5Petit Canal wind farmOnshore wind12 MWOperating2019
6Saint-François solar projectNCSolar PV4 MWOperating2017
7Guadeloupe solar project XIVNCSolar PV4 MWOperating2019
8Guadeloupe solar project IINCSolar PV4 MWOperating2017
9Guadeloupe solar project VIIINCSolar PV4 MWOperating2017
10Guadeloupe solar project XIIISolar PV4 MWOperating2018

Largest in the pipeline

The five largest renewable projects under construction or announced in Guadeloupe.
#PlantTechnologyCapacityStatusStarted
1Bouillante geothermal power plantGeothermal10 MWAnnounced2026

Questions

How much renewable energy capacity does Guadeloupe have?

Guadeloupe has 195 MW of operating renewable capacity across 19 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Guadeloupe?

Bioenergy, with 102 MW operating, which is 52% of Guadeloupe's operating renewable capacity in the data.

What share of Guadeloupe's power capacity is renewable?

40% of the operating capacity in this dataset (195 MW of 487 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Guadeloupe building renewables?

Operating plants that started from 2015 to 2025 total 78 MW, and the biggest single year in the data is 1998 with 64 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Guadeloupe?

Le Moule Power Station, a bioenergy plant of 102 MW, which started operating in 1998.

How much renewable capacity is being built or planned in Guadeloupe?

0 MW is under construction and 10 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.