Renewable energy in Kosovo
Kosovo has 187 MW of operating renewable capacity in the data, across 6 plants. Onshore wind is the largest source at 135 MW (72% of the total). That is 13% of the 1.5 GW of operating power capacity of all kinds that the same tracker lists for Kosovo (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 152 MW, which is 81% of today's operating renewable capacity. A further 150 MW is under construction and 641 MW is announced or in pre-construction.
- Operating
- 187 MW6 plants
- Share of capacity in this dataset
- 13%of 1.5 GW operating, all kinds
- Started 2015 to 2025
- 152 MWoperating plants
- Pipeline
- 791 MW150 MW building, 641 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 17 MW | 3 | 9.0% | 150 MW | 363 MW |
| Onshore wind | 135 MW | 2 | 72% | 0 | 278 MW |
| Hydropower | 35 MW | 1 | 19% | 0 | 0 |
| All renewables | 187 MW | 6 | 100% | 150 MW | 641 MW |
Of the operating solar, 17 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2018 | 43 MW | 11 MW | 0 | 32 MW | 0 | 0 | 0 | 0 | 0 |
| 2019 | 4 MW | 4 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2021 | 103 MW | 0 | 0 | 103 MW | 0 | 0 | 0 | 0 | 0 |
| 2023 | 3 MW | 3 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2021 with 103 MW.
Largest renewable plants in Kosovo
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Bajgora wind farm | Onshore wind | 103 MW | Operating | 2021 |
| 2 | Ujmani hydroelectric plant | Hydropower | 35 MW | Operating | 1988 |
| 3 | Kitka wind farm | Onshore wind | 32 MW | Operating | 2018 |
| 4 | Kosovo solar project IINC | Solar PV | 11 MW | Operating | 2018 |
| 5 | Kosovo solar project INC | Solar PV | 4 MW | Operating | 2019 |
| 6 | Kosovo solar project IIINC | Solar PV | 3 MW | Operating | 2023 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Gjakova solar farm | Solar PV | 150 MW | Under construction | 2026 |
| 2 | Jasenovik Hybrid wind farm | Onshore wind | 132 MW | Announced | not recorded |
| 3 | Solar4Kosovo solar farm | Solar PV | 120 MW | Announced | not recorded |
| 4 | Lindja solar farm | Solar PV | 105 MW | Announced | not recorded |
| 5 | Rahovec solar farm | Solar PV | 100 MW | Announced | not recorded |
Questions
How much renewable energy capacity does Kosovo have?
Kosovo has 187 MW of operating renewable capacity across 6 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Kosovo?
Onshore wind, with 135 MW operating, which is 72% of Kosovo's operating renewable capacity in the data.
What share of Kosovo's power capacity is renewable?
13% of the operating capacity in this dataset (187 MW of 1.5 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Kosovo building renewables?
Operating plants that started from 2015 to 2025 total 152 MW, and the biggest single year in the data is 2021 with 103 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Kosovo?
Bajgora wind farm, a onshore wind plant of 103 MW, which started operating in 2021.
How much renewable capacity is being built or planned in Kosovo?
150 MW is under construction and 641 MW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.