Renewable energy in Moldova

Moldova has 214 MW of operating renewable capacity in the data, across 48 plants. Solar PV is the largest source at 166 MW (78% of the total). That is 16% of the 1.4 GW of operating power capacity of all kinds that the same tracker lists for Moldova (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 166 MW, which is 78% of today's operating renewable capacity. No renewable pipeline is recorded.

Operating
214 MW48 plants
Share of capacity in this dataset
16%of 1.4 GW operating, all kinds
Started 2015 to 2025
166 MWoperating plants
Pipeline
None recorded0 MW building, 0 MW announced

Capacity by technology

Renewable capacity in Moldova by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV166 MW4778%00
Hydropower48 MW123%00
All renewables214 MW48100%0 MW0 MW

Of the operating solar, 166 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW50 MW100 MW19901995200020052010201520202025
Solar PVHydropower
Show the figures as a table
Operating renewable capacity in Moldova by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
20182 MW2 MW0000000
20201 MW1 MW0000000
202124 MW24 MW0000000
202219 MW19 MW0000000
202356 MW56 MW0000000
202464 MW64 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2024 with 64 MW.

Largest renewable plants in Moldova

The ten largest operating renewable plants in Moldova.
#PlantTechnologyCapacityStatusStarted
1Dubăsari hydroelectric plantHydropower48 MWOperating1954
2Moldova solar project XIINCSolar PV15 MWOperating2023
3Moldova solar project XNCSolar PV13 MWOperating2024
4Moldova solar project XVINCSolar PV12 MWOperating2024
5Moldova solar project XXXVINCSolar PV9 MWOperating2024
6Moldova solar project XXIXNCSolar PV8 MWOperating2023
7Moldova solar project IXNCSolar PV8 MWOperating2021
8Moldova solar project XXIINCSolar PV7 MWOperating2022
9Cahul solar projectNCSolar PV7 MWOperating2023
10Moldova solar project XXXIVNCSolar PV6 MWOperating2024

Questions

How much renewable energy capacity does Moldova have?

Moldova has 214 MW of operating renewable capacity across 48 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Moldova?

Solar PV, with 166 MW operating, which is 78% of Moldova's operating renewable capacity in the data.

What share of Moldova's power capacity is renewable?

16% of the operating capacity in this dataset (214 MW of 1.4 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Moldova building renewables?

Operating plants that started from 2015 to 2025 total 166 MW, and the biggest single year in the data is 2024 with 64 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Moldova?

Dubăsari hydroelectric plant, a hydropower plant of 48 MW, which started operating in 1954.

How much renewable capacity is being built or planned in Moldova?

No renewable pipeline is recorded for Moldova.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.