Renewable energy in Andorra

Andorra has 66 MW of operating renewable capacity in the data, across 4 plants. Hydropower is the largest source at 45 MW (68% of the total). That is 100% of the 66 MW of operating power capacity of all kinds that the same tracker lists for Andorra (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 3 MW, which is 5.0% of today's operating renewable capacity. No renewable pipeline is recorded.

Operating
66 MW4 plants
Share of capacity in this dataset
100%of 66 MW operating, all kinds
Started 2015 to 2025
3 MWoperating plants
Pipeline
None recorded0 MW building, 0 MW announced

Capacity by technology

Renewable capacity in Andorra by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV3 MW25.0%00
Hydropower45 MW168%00
Bioenergy18 MW127%00
All renewables66 MW4100%0 MW0 MW

Of the operating solar, 3 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW1 MW2 MW19901995200020052010201520202025
Solar PVHydropower
Show the figures as a table
Operating renewable capacity in Andorra by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
20212 MW2 MW0000000
20232 MW2 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 18 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1934 with 45 MW.

Largest renewable plants in Andorra

The ten largest operating renewable plants in Andorra.
#PlantTechnologyCapacityStatusStarted
1Les Escaldes hydroelectric plantHydropower45 MWOperating1934
2Andorra Waste to Energy power stationBioenergy18 MWOperatingnot recorded
3Andorra solar projectNCSolar PV2 MWOperating2023
4Les Valls De Valira Alt Urgell solar projectNCSolar PV2 MWOperating2021

Questions

How much renewable energy capacity does Andorra have?

Andorra has 66 MW of operating renewable capacity across 4 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Andorra?

Hydropower, with 45 MW operating, which is 68% of Andorra's operating renewable capacity in the data.

What share of Andorra's power capacity is renewable?

100% of the operating capacity in this dataset (66 MW of 66 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Andorra building renewables?

Operating plants that started from 2015 to 2025 total 3 MW, and the biggest single year in the data is 1934 with 45 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Andorra?

Les Escaldes hydroelectric plant, a hydropower plant of 45 MW, which started operating in 1934.

How much renewable capacity is being built or planned in Andorra?

No renewable pipeline is recorded for Andorra.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.