Renewable energy in Guatemala

Guatemala has 2.4 GW of operating renewable capacity in the data, across 44 plants. Hydropower is the largest source at 952 MW (40% of the total). That is 75% of the 3.2 GW of operating power capacity of all kinds that the same tracker lists for Guatemala (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 889 MW, which is 38% of today's operating renewable capacity. A further 231 MW is under construction and 113 MW is announced or in pre-construction.

Operating
2.4 GW44 plants
Share of capacity in this dataset
75%of 3.2 GW operating, all kinds
Started 2015 to 2025
889 MWoperating plants
Pipeline
345 MW231 MW building, 113 MW announced

Capacity by technology

Renewable capacity in Guatemala by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV364 MW1815%166 MW113 MW
Onshore wind106 MW34.5%65 MW0
Hydropower952 MW1040%00
Geothermal46 MW22.0%00
Bioenergy888 MW1138%00
All renewables2.4 GW44100%231 MW113 MW

Of the operating solar, 37 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW250 MW500 MW19901995200020052010201520202025
Solar PVOnshore windHydropowerGeothermalBioenergy
Show the figures as a table
Operating renewable capacity in Guatemala by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
199797 MW00000097 MW0
199885 MW00000085 MW0
199924 MW0000024 MW00
200028 MW00000028 MW0
200239 MW000039 MW000
200348 MW000048 MW000
2004140 MW000068 MW072 MW0
200546 MW00000046 MW0
200622 MW0000022 MW00
200845 MW00000045 MW0
201097 MW000097 MW000
2012149 MW000087 MW062 MW0
2014140 MW14 MW00000126 MW0
2015321 MW93 MW076 MW000152 MW0
2016225 MW0000117 MW0108 MW0
201720 MW20 MW0000000
201886 MW0030 MW056 MW000
202213 MW13 MW0000000
20235 MW5 MW0000000
20246 MW6 MW0000000
2025213 MW213 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 28 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2015 with 321 MW.

Largest renewable plants in Guatemala

The ten largest operating renewable plants in Guatemala.
#PlantTechnologyCapacityStatusStarted
1Pueblo Viejo hydroelectric plantHydropower300 MWOperating1983
2Magdalena Sugar Mill power stationBioenergy241 MWOperating2004
3Pantaleón power stationBioenergy121 MWOperating1997
4Renace 2 Phase 1 hydroelectric plantHydropower117 MWOperating2016
5Santa Ana power stationBioenergy104 MWOperating1984
6Xacbal hydroelectric plantHydropower97 MWOperating2010
7Horus Energy PV Solar PlantSolar PV93 MWOperating2015
8Trinidad power stationBioenergy92 MWOperating2005
9Palo Viejo hydroelectric plantHydropower87 MWOperating2012
10Ingenio La Unión power stationBioenergy85 MWOperating1998

Largest in the pipeline

The five largest renewable projects under construction or announced in Guatemala.
#PlantTechnologyCapacityStatusStarted
1Santo Tomás solar farmSolar PV100 MWUnder construction2026
2Tierra del Sol solar farmSolar PV75 MWAnnounced2027
3Solarium solar farmSolar PV66 MWUnder constructionnot recorded
4Comapa Wind ProjectOnshore wind65 MWUnder constructionnot recorded
5Cox Energy solar farmSolar PV38 MWAnnounced2028

Questions

How much renewable energy capacity does Guatemala have?

Guatemala has 2.4 GW of operating renewable capacity across 44 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Guatemala?

Hydropower, with 952 MW operating, which is 40% of Guatemala's operating renewable capacity in the data.

What share of Guatemala's power capacity is renewable?

75% of the operating capacity in this dataset (2.4 GW of 3.2 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Guatemala building renewables?

Operating plants that started from 2015 to 2025 total 889 MW, and the biggest single year in the data is 2015 with 321 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Guatemala?

Pueblo Viejo hydroelectric plant, a hydropower plant of 300 MW, which started operating in 1983.

How much renewable capacity is being built or planned in Guatemala?

231 MW is under construction and 113 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.