Renewable energy in Guatemala
Guatemala has 2.4 GW of operating renewable capacity in the data, across 44 plants. Hydropower is the largest source at 952 MW (40% of the total). That is 75% of the 3.2 GW of operating power capacity of all kinds that the same tracker lists for Guatemala (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 889 MW, which is 38% of today's operating renewable capacity. A further 231 MW is under construction and 113 MW is announced or in pre-construction.
- Operating
- 2.4 GW44 plants
- Share of capacity in this dataset
- 75%of 3.2 GW operating, all kinds
- Started 2015 to 2025
- 889 MWoperating plants
- Pipeline
- 345 MW231 MW building, 113 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 364 MW | 18 | 15% | 166 MW | 113 MW |
| Onshore wind | 106 MW | 3 | 4.5% | 65 MW | 0 |
| Hydropower | 952 MW | 10 | 40% | 0 | 0 |
| Geothermal | 46 MW | 2 | 2.0% | 0 | 0 |
| Bioenergy | 888 MW | 11 | 38% | 0 | 0 |
| All renewables | 2.4 GW | 44 | 100% | 231 MW | 113 MW |
Of the operating solar, 37 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 1997 | 97 MW | 0 | 0 | 0 | 0 | 0 | 0 | 97 MW | 0 |
| 1998 | 85 MW | 0 | 0 | 0 | 0 | 0 | 0 | 85 MW | 0 |
| 1999 | 24 MW | 0 | 0 | 0 | 0 | 0 | 24 MW | 0 | 0 |
| 2000 | 28 MW | 0 | 0 | 0 | 0 | 0 | 0 | 28 MW | 0 |
| 2002 | 39 MW | 0 | 0 | 0 | 0 | 39 MW | 0 | 0 | 0 |
| 2003 | 48 MW | 0 | 0 | 0 | 0 | 48 MW | 0 | 0 | 0 |
| 2004 | 140 MW | 0 | 0 | 0 | 0 | 68 MW | 0 | 72 MW | 0 |
| 2005 | 46 MW | 0 | 0 | 0 | 0 | 0 | 0 | 46 MW | 0 |
| 2006 | 22 MW | 0 | 0 | 0 | 0 | 0 | 22 MW | 0 | 0 |
| 2008 | 45 MW | 0 | 0 | 0 | 0 | 0 | 0 | 45 MW | 0 |
| 2010 | 97 MW | 0 | 0 | 0 | 0 | 97 MW | 0 | 0 | 0 |
| 2012 | 149 MW | 0 | 0 | 0 | 0 | 87 MW | 0 | 62 MW | 0 |
| 2014 | 140 MW | 14 MW | 0 | 0 | 0 | 0 | 0 | 126 MW | 0 |
| 2015 | 321 MW | 93 MW | 0 | 76 MW | 0 | 0 | 0 | 152 MW | 0 |
| 2016 | 225 MW | 0 | 0 | 0 | 0 | 117 MW | 0 | 108 MW | 0 |
| 2017 | 20 MW | 20 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2018 | 86 MW | 0 | 0 | 30 MW | 0 | 56 MW | 0 | 0 | 0 |
| 2022 | 13 MW | 13 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2023 | 5 MW | 5 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2024 | 6 MW | 6 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2025 | 213 MW | 213 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 28 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2015 with 321 MW.
Largest renewable plants in Guatemala
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Pueblo Viejo hydroelectric plant | Hydropower | 300 MW | Operating | 1983 |
| 2 | Magdalena Sugar Mill power station | Bioenergy | 241 MW | Operating | 2004 |
| 3 | Pantaleón power station | Bioenergy | 121 MW | Operating | 1997 |
| 4 | Renace 2 Phase 1 hydroelectric plant | Hydropower | 117 MW | Operating | 2016 |
| 5 | Santa Ana power station | Bioenergy | 104 MW | Operating | 1984 |
| 6 | Xacbal hydroelectric plant | Hydropower | 97 MW | Operating | 2010 |
| 7 | Horus Energy PV Solar Plant | Solar PV | 93 MW | Operating | 2015 |
| 8 | Trinidad power station | Bioenergy | 92 MW | Operating | 2005 |
| 9 | Palo Viejo hydroelectric plant | Hydropower | 87 MW | Operating | 2012 |
| 10 | Ingenio La Unión power station | Bioenergy | 85 MW | Operating | 1998 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Santo Tomás solar farm | Solar PV | 100 MW | Under construction | 2026 |
| 2 | Tierra del Sol solar farm | Solar PV | 75 MW | Announced | 2027 |
| 3 | Solarium solar farm | Solar PV | 66 MW | Under construction | not recorded |
| 4 | Comapa Wind Project | Onshore wind | 65 MW | Under construction | not recorded |
| 5 | Cox Energy solar farm | Solar PV | 38 MW | Announced | 2028 |
Questions
How much renewable energy capacity does Guatemala have?
Guatemala has 2.4 GW of operating renewable capacity across 44 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Guatemala?
Hydropower, with 952 MW operating, which is 40% of Guatemala's operating renewable capacity in the data.
What share of Guatemala's power capacity is renewable?
75% of the operating capacity in this dataset (2.4 GW of 3.2 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Guatemala building renewables?
Operating plants that started from 2015 to 2025 total 889 MW, and the biggest single year in the data is 2015 with 321 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Guatemala?
Pueblo Viejo hydroelectric plant, a hydropower plant of 300 MW, which started operating in 1983.
How much renewable capacity is being built or planned in Guatemala?
231 MW is under construction and 113 MW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.