Renewable energy in Costa Rica
Costa Rica has 2.5 GW of operating renewable capacity in the data, across 48 plants. Hydropower is the largest source at 1.8 GW (71% of the total). That is 82% of the 3.1 GW of operating power capacity of all kinds that the same tracker lists for Costa Rica (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 629 MW, which is 25% of today's operating renewable capacity. A further 55 MW is under construction and 394 MW is announced or in pre-construction.
- Operating
- 2.5 GW48 plants
- Share of capacity in this dataset
- 82%of 3.1 GW operating, all kinds
- Started 2015 to 2025
- 629 MWoperating plants
- Pipeline
- 449 MW55 MW building, 394 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 22 MW | 5 | 0.9% | 0 | 230 MW |
| Onshore wind | 442 MW | 19 | 17% | 0 | 109 MW |
| Hydropower | 1.8 GW | 19 | 71% | 0 | 0 |
| Geothermal | 234 MW | 3 | 9.2% | 55 MW | 55 MW |
| Bioenergy | 50 MW | 2 | 1.9% | 0 | 0 |
| All renewables | 2.5 GW | 48 | 100% | 55 MW | 394 MW |
Of the operating solar, 18 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 1994 | 60 MW | 0 | 0 | 0 | 0 | 0 | 60 MW | 0 | 0 |
| 1996 | 88 MW | 0 | 0 | 23 MW | 0 | 65 MW | 0 | 0 | 0 |
| 1997 | 24 MW | 0 | 0 | 24 MW | 0 | 0 | 0 | 0 | 0 |
| 1998 | 62 MW | 0 | 0 | 7 MW | 0 | 0 | 55 MW | 0 | 0 |
| 2000 | 201 MW | 0 | 0 | 0 | 0 | 172 MW | 29 MW | 0 | 0 |
| 2002 | 51 MW | 0 | 0 | 13 MW | 0 | 38 MW | 0 | 0 | 0 |
| 2006 | 50 MW | 0 | 0 | 0 | 0 | 50 MW | 0 | 0 | 0 |
| 2007 | 82 MW | 0 | 0 | 0 | 0 | 82 MW | 0 | 0 | 0 |
| 2010 | 184 MW | 0 | 0 | 50 MW | 0 | 134 MW | 0 | 0 | 0 |
| 2011 | 48 MW | 0 | 0 | 13 MW | 0 | 0 | 35 MW | 0 | 0 |
| 2012 | 15 MW | 0 | 0 | 15 MW | 0 | 0 | 0 | 0 | 0 |
| 2013 | 49 MW | 0 | 0 | 0 | 0 | 49 MW | 0 | 0 | 0 |
| 2014 | 88 MW | 0 | 0 | 50 MW | 0 | 38 MW | 0 | 0 | 0 |
| 2015 | 121 MW | 0 | 0 | 71 MW | 0 | 50 MW | 0 | 0 | 0 |
| 2016 | 367 MW | 0 | 0 | 12 MW | 0 | 355 MW | 0 | 0 | 0 |
| 2017 | 5 MW | 5 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2019 | 92 MW | 7 MW | 0 | 30 MW | 0 | 0 | 55 MW | 0 | 0 |
| 2021 | 4 MW | 4 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2022 | 6 MW | 6 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2025 | 34 MW | 0 | 0 | 34 MW | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 182 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2016 with 367 MW.
Largest renewable plants in Costa Rica
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Reventazón hydroelectric plant | Hydropower | 305 MW | Operating | 2016 |
| 2 | Miguel Pablo Dengo hydroelectric plant | Hydropower | 174 MW | Operating | 1982 |
| 3 | Angostura hydroelectric plant (Costa Rica) | Hydropower | 172 MW | Operating | 2000 |
| 4 | Arenal hydroelectric plant (Costa Rica) | Hydropower | 157 MW | Operating | 1979 |
| 5 | Río Macho hydroelectric plant | Hydropower | 140 MW | Operating | 1963 |
| 6 | Miravalles geothermal power plant | Geothermal | 139 MW | Operating | 1994 |
| 7 | Pirrís hydroelectric plant | Hydropower | 134 MW | Operating | 2010 |
| 8 | Cachí hydroelectric plant | Hydropower | 102 MW | Operating | 1966 |
| 9 | Ventanas-Garita hydroelectric plant | Hydropower | 97 MW | Operating | 1958 |
| 10 | Las Pailas geothermal power plant | Geothermal | 90 MW | Operating | 2011 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Las Delicias solar farm | Solar PV | 78 MW | Announced | not recorded |
| 2 | ICE Colorado solar farm | Solar PV | 66 MW | Announced | 2027 |
| 3 | Borinquen geothermal power project | Geothermal | 55 MW | Under construction | 2027 |
| 4 | Borinquen geothermal power project | Geothermal | 55 MW | Announced | 2027 |
| 5 | Tejona wind farm | Onshore wind | 29 MW | Announced | 2026 |
Questions
How much renewable energy capacity does Costa Rica have?
Costa Rica has 2.5 GW of operating renewable capacity across 48 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Costa Rica?
Hydropower, with 1.8 GW operating, which is 71% of Costa Rica's operating renewable capacity in the data.
What share of Costa Rica's power capacity is renewable?
82% of the operating capacity in this dataset (2.5 GW of 3.1 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Costa Rica building renewables?
Operating plants that started from 2015 to 2025 total 629 MW, and the biggest single year in the data is 2016 with 367 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Costa Rica?
Reventazón hydroelectric plant, a hydropower plant of 305 MW, which started operating in 2016.
How much renewable capacity is being built or planned in Costa Rica?
55 MW is under construction and 394 MW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.