Renewable energy in DR Congo

DR Congo has 2.9 GW of operating renewable capacity in the data, across 18 plants. Hydropower is the largest source at 2.9 GW (99% of the total). That is 100% of the 2.9 GW of operating power capacity of all kinds that the same tracker lists for DR Congo (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 561 MW, which is 19% of today's operating renewable capacity. A further 398 MW is under construction and 8.2 GW is announced or in pre-construction.

Operating
2.9 GW18 plants
Share of capacity in this dataset
100%of 2.9 GW operating, all kinds
Started 2015 to 2025
561 MWoperating plants
Pipeline
8.6 GW398 MW building, 8.2 GW announced

Capacity by technology

Renewable capacity in DR Congo by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV32 MW51.1%248 MW2.0 GW
Hydropower2.9 GW1399%150 MW6.1 GW
Bioenergy000.0%060 MW
All renewables2.9 GW18100%398 MW8.2 GW

Of the operating solar, 16 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW250 MW500 MW19901995200020052010201520202025
Solar PVHydropower
Show the figures as a table
Operating renewable capacity in DR Congo by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
201664 MW000064 MW000
2018225 MW0000225 MW000
2023251 MW11 MW000240 MW000
20245 MW5 MW0000000
202516 MW16 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1982 with 1.4 GW.

Largest renewable plants in DR Congo

The ten largest operating renewable plants in DR Congo.
#PlantTechnologyCapacityStatusStarted
1Inga II hydroelectric plantHydropower1.4 GWOperating1982
2Inga I hydroelectric plantHydropower351 MWOperating1972
3N'Seke hydroelectric plantHydropower260 MWOperating1956
4Busanga hydroelectric plantHydropower240 MWOperating2023
5Zongo II hydroelectric plantHydropower150 MWOperating2018
6N'Zilo 1 hydroelectric plantHydropower108 MWOperating1952
7Mwadingusha hydroelectric plantHydropower78 MWOperating1930
8Zongo I hydroelectric plantHydropower75 MWOperating2018
9Katende hydroelectric plantHydropower64 MWOperating2016
10Koni hydroelectric plantHydropower42 MWOperating1950

Largest in the pipeline

The five largest renewable projects under construction or announced in DR Congo.
#PlantTechnologyCapacityStatusStarted
1Inga III hydroelectric plantHydropower4.8 GWAnnouncednot recorded
2DR Congo (SkyPower) solar projectSolar PV1.0 GWAnnouncednot recorded
3Fipango solar farmSolar PV300 MWAnnouncednot recorded
4Mumbotuta CX hydroelectric plantHydropower300 MWAnnounced2028
5Ruzizi IV hydroelectric plantHydropower288 MWAnnouncednot recorded

Questions

How much renewable energy capacity does DR Congo have?

DR Congo has 2.9 GW of operating renewable capacity across 18 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in DR Congo?

Hydropower, with 2.9 GW operating, which is 99% of DR Congo's operating renewable capacity in the data.

What share of DR Congo's power capacity is renewable?

100% of the operating capacity in this dataset (2.9 GW of 2.9 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is DR Congo building renewables?

Operating plants that started from 2015 to 2025 total 561 MW, and the biggest single year in the data is 1982 with 1.4 GW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in DR Congo?

Inga II hydroelectric plant, a hydropower plant of 1.4 GW, which started operating in 1982.

How much renewable capacity is being built or planned in DR Congo?

398 MW is under construction and 8.2 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.