Renewable energy in Brazil

Brazil has 188 GW of operating renewable capacity in the data, across 3,802 plants. Hydropower is the largest source at 110 GW (58% of the total). That is 86% of the 218 GW of operating power capacity of all kinds that the same tracker lists for Brazil (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 73.1 GW, which is 39% of today's operating renewable capacity. A further 7.0 GW is under construction and 408 GW is announced or in pre-construction.

Operating
188 GW3,802 plants
Share of capacity in this dataset
86%of 218 GW operating, all kinds
Started 2015 to 2025
73.1 GWoperating plants
Pipeline
415 GW7.0 GW building, 408 GW announced

Capacity by technology

Renewable capacity in Brazil by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV24.9 GW2,75913%4.8 GW124 GW
Onshore wind36.0 GW26719%1.5 GW28.6 GW
Offshore wind000.0%0248 GW
Hydropower110 GW19458%07.6 GW
Bioenergy17.6 GW5829.4%767 MW529 MW
All renewables188 GW3,802100%7.0 GW408 GW

The build-out by year

0 MW10.0 GW20.0 GW19901995200020052010201520202025
Solar PVOnshore windHydropowerBioenergy
Show the figures as a table
Operating renewable capacity in Brazil by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
199024 MW00000024 MW0
19921.9 GW00001,785 MW0143 MW0
1993808 MW0000808 MW000
19944.1 GW00003,672 MW0379 MW0
1995171 MW000084 MW087 MW0
1996390 MW0000375 MW015 MW0
1997233 MW002 MW0140 MW090 MW0
19982.0 GW005 MW01,953 MW051 MW0
19993.1 GW0013 MW02,991 MW076 MW0
20002.0 GW00001,715 MW0324 MW0
20011.6 GW00001,140 MW0497 MW0
20022.6 GW00002,017 MW0593 MW0
20031.1 GW0000854 MW0257 MW0
2004508 MW007 MW0395 MW0106 MW0
20051.5 GW00001,346 MW0134 MW0
20062.4 GW00208 MW01,557 MW0673 MW0
20071.5 GW0010 MW01,150 MW0334 MW0
20081.2 GW0096 MW0407 MW0671 MW0
20092.4 GW00265 MW0814 MW01,275 MW0
20103.6 GW00327 MW01,614 MW01,696 MW0
20112.7 GW6 MW0373 MW01,563 MW0759 MW0
20125.2 GW00597 MW04,068 MW0575 MW0
20135.9 GW00351 MW04,354 MW01,178 MW0
20144.4 GW9 MW02,778 MW0698 MW0937 MW0
20155.1 GW14 MW02,653 MW01,820 MW0625 MW0
201614.8 GW8 MW02,635 MW011,591 MW0599 MW0
20174.2 GW989 MW02,112 MW0760 MW0380 MW0
20183.1 GW850 MW02,063 MW060 MW093 MW0
20192.9 GW730 MW0943 MW01,052 MW0191 MW0
20203.2 GW1,196 MW01,778 MW000231 MW0
20215.9 GW1,551 MW03,677 MW000653 MW0
20228.2 GW4,274 MW02,852 MW0172 MW0943 MW0
20239.7 GW3,877 MW05,440 MW000376 MW0
202411.7 GW7,141 MW04,331 MW000274 MW0
20254.1 GW1,987 MW01,522 MW000630 MW0

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 3.7 GW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1984 with 22.6 GW.

Largest renewable plants in Brazil

The ten largest operating renewable plants in Brazil.
#PlantTechnologyCapacityStatusStarted
1Itaipu hydroelectric plantHydropower14.0 GWOperating1984
2Belo Monte hydroelectric plantHydropower11.2 GWOperating2016
3Tucuruí hydroelectric plantHydropower8.5 GWOperating1984
4Jirau hydroelectric plantHydropower3.8 GWOperating2013
5Santo Antônio hydroelectric plant (Rondônia)Hydropower3.6 GWOperating2012
6Ilha Solteira hydroelectric plantHydropower3.4 GWOperating1973
7Xingó hydroelectric plantHydropower3.2 GWOperating1994
8Paulo Afonso IV hydroelectric plantHydropower2.5 GWOperating1979
9Itumbiara hydroelectric plantHydropower2.1 GWOperating1980
10Teles Pires hydroelectric plantHydropower1.8 GWOperating2015

Largest in the pipeline

The five largest renewable projects under construction or announced in Brazil.
#PlantTechnologyCapacityStatusStarted
1CGN Quinto Bahia Green Hydrogen Hybrid solar farmSolar PV7.0 GWAnnouncednot recorded
2CGN Quinto Bahia Green Hydrogen Hybrid wind farmOnshore wind7.0 GWAnnouncednot recorded
3Ventos Do Sul offshore wind farmOffshore wind6.5 GWAnnouncednot recorded
4Complexo Offshore do Sul Offshore wind farmOffshore wind6.3 GWAnnouncednot recorded
5Alpha Offshore wind farmOffshore wind6.0 GWAnnouncednot recorded

Questions

How much renewable energy capacity does Brazil have?

Brazil has 188 GW of operating renewable capacity across 3,802 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Brazil?

Hydropower, with 110 GW operating, which is 58% of Brazil's operating renewable capacity in the data.

What share of Brazil's power capacity is renewable?

86% of the operating capacity in this dataset (188 GW of 218 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Brazil building renewables?

Operating plants that started from 2015 to 2025 total 73.1 GW, and the biggest single year in the data is 1984 with 22.6 GW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Brazil?

Itaipu hydroelectric plant, a hydropower plant of 14.0 GW, which started operating in 1984.

How much renewable capacity is being built or planned in Brazil?

7.0 GW is under construction and 408 GW is announced or in pre-construction. Some announced projects will never be built.

Does Brazil have offshore wind?

Yes: 0 MW operating, 0 MW under construction and 248 GW announced or in pre-construction.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.