Renewable energy in Uzbekistan
Uzbekistan has 6.0 GW of operating renewable capacity in the data, across 56 plants. Solar PV is the largest source at 2.5 GW (42% of the total). That is 25% of the 24.0 GW of operating power capacity of all kinds that the same tracker lists for Uzbekistan (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 4.2 GW, which is 69% of today's operating renewable capacity. A further 1.3 GW is under construction and 17.6 GW is announced or in pre-construction.
- Operating
- 6.0 GW56 plants
- Share of capacity in this dataset
- 25%of 24.0 GW operating, all kinds
- Started 2015 to 2025
- 4.2 GWoperating plants
- Pipeline
- 18.9 GW1.3 GW building, 17.6 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 2.5 GW | 38 | 42% | 757 MW | 3.9 GW |
| Onshore wind | 1.6 GW | 4 | 27% | 20 MW | 13.4 GW |
| Hydropower | 1.9 GW | 14 | 32% | 490 MW | 200 MW |
| Bioenergy | 0 | 0 | 0.0% | 20 MW | 92 MW |
| All renewables | 6.0 GW | 56 | 100% | 1.3 GW | 17.6 GW |
Of the operating solar, 71 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2010 | 95 MW | 0 | 0 | 0 | 0 | 95 MW | 0 | 0 | 0 |
| 2017 | 5 MW | 5 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2021 | 175 MW | 100 MW | 0 | 0 | 0 | 75 MW | 0 | 0 | 0 |
| 2022 | 101 MW | 101 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2023 | 202 MW | 27 MW | 0 | 0 | 0 | 175 MW | 0 | 0 | 0 |
| 2024 | 2.2 GW | 1,243 MW | 0 | 1,000 MW | 0 | 0 | 0 | 0 | 0 |
| 2025 | 1.4 GW | 848 MW | 0 | 600 MW | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2024 with 2.2 GW.
Largest renewable plants in Uzbekistan
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Charvak hydroelectric plant | Hydropower | 666 MW | Operating | 1977 |
| 2 | Karaulbazar solar farm | Solar PV | 500 MW | Operating | 2024 |
| 3 | Nishan solar farm | Solar PV | 500 MW | Operating | 2024 |
| 4 | Bash wind farm | Onshore wind | 500 MW | Operating | 2024 |
| 5 | Dzhankeldy wind farm | Onshore wind | 500 MW | Operating | 2024 |
| 6 | Zarafshan wind farm | Onshore wind | 500 MW | Operating | 2025 |
| 7 | Buka solar farm | Solar PV | 263 MW | Operating | 2025 |
| 8 | Nur-Bukhara solar farm | Solar PV | 250 MW | Operating | 2025 |
| 9 | Jizzakh solar farm | Solar PV | 220 MW | Operating | 2025 |
| 10 | Samarkand (Masdar) solar farm | Solar PV | 220 MW | Operating | 2024 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Aral wind farm | Onshore wind | 5.0 GW | Announced | not recorded |
| 2 | Kungrad (ACWA Power) wind farm | Onshore wind | 2.0 GW | Announced | 2027 |
| 3 | Sazagan solar farm | Solar PV | 1.0 GW | Announced | not recorded |
| 4 | AMEA Karakalpakstan wind farm | Onshore wind | 1.0 GW | Announced | not recorded |
| 5 | Kungrad (Sany Renewable) wind farm | Onshore wind | 1.0 GW | Announced | not recorded |
Questions
How much renewable energy capacity does Uzbekistan have?
Uzbekistan has 6.0 GW of operating renewable capacity across 56 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Uzbekistan?
Solar PV, with 2.5 GW operating, which is 42% of Uzbekistan's operating renewable capacity in the data.
What share of Uzbekistan's power capacity is renewable?
25% of the operating capacity in this dataset (6.0 GW of 24.0 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Uzbekistan building renewables?
Operating plants that started from 2015 to 2025 total 4.2 GW, and the biggest single year in the data is 2024 with 2.2 GW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Uzbekistan?
Charvak hydroelectric plant, a hydropower plant of 666 MW, which started operating in 1977.
How much renewable capacity is being built or planned in Uzbekistan?
1.3 GW is under construction and 17.6 GW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.