Tajikistan has 5.8 GW of operating renewable capacity in the data, across 9 plants. Hydropower is the largest source at 5.8 GW (100% of the total). That is 91% of the 6.4 GW of operating power capacity of all kinds that the same tracker lists for Tajikistan (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 1.2 GW, which is 21% of today's operating renewable capacity. A further 2.7 GW is under construction and 2.3 GW is announced or in pre-construction.
- Operating
- 5.8 GW9 plants
- Share of capacity in this dataset
- 91%of 6.4 GW operating, all kinds
- Started 2015 to 2025
- 1.2 GWoperating plants
- Pipeline
- 5.0 GW2.7 GW building, 2.3 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 1 MW | 1 | <0.1% | 0 | 900 MW |
| Hydropower | 5.8 GW | 8 | 100% | 2.7 GW | 1.4 GW |
| All renewables | 5.8 GW | 9 | 100% | 2.7 GW | 2.3 GW |
Of the operating solar, 1 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2008 | 670 MW | 0 | 0 | 0 | 0 | 670 MW | 0 | 0 | 0 |
| 2011 | 220 MW | 0 | 0 | 0 | 0 | 220 MW | 0 | 0 | 0 |
| 2018 | 1.2 GW | 0 | 0 | 0 | 0 | 1,200 MW | 0 | 0 | 0 |
| 2021 | 1 MW | 1 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1972 with 2.7 GW.
Largest renewable plants in Tajikistan
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Nurek hydroelectric plant | Hydropower | 2.7 GW | Operating | 1972 |
| 2 | Rogun hydroelectric plant | Hydropower | 1.2 GW | Operating | 2018 |
| 3 | Sangtuda-1 hydroelectric plant | Hydropower | 670 MW | Operating | 2008 |
| 4 | Baipaza hydroelectric plant | Hydropower | 600 MW | Operating | 1985 |
| 5 | Sarband hydroelectric plant | Hydropower | 240 MW | Operating | 1962 |
| 6 | Sangtuda-2 hydroelectric plant | Hydropower | 220 MW | Operating | 2011 |
| 7 | Kairakkum hydroelectric plant | Hydropower | 174 MW | Operating | 1956 |
| 8 | Sharshara hydroelectric plant | Hydropower | 30 MW | Operating | 1958 |
| 9 | Murghob District solar projectNC | Solar PV | 1 MW | Operating | 2021 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Rogun hydroelectric plant | Hydropower | 2.4 GW | Under construction | 2026 |
| 2 | Shurob hydroelectric plant | Hydropower | 850 MW | Announced | not recorded |
| 3 | Sughd (China Datang) solar farm | Solar PV | 500 MW | Announced | not recorded |
| 4 | Panj solar farm | Solar PV | 200 MW | Announced | not recorded |
| 5 | Sughd Region solar farm | Solar PV | 200 MW | Announced | not recorded |
Questions
How much renewable energy capacity does Tajikistan have?
Tajikistan has 5.8 GW of operating renewable capacity across 9 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Tajikistan?
Hydropower, with 5.8 GW operating, which is 100% of Tajikistan's operating renewable capacity in the data.
What share of Tajikistan's power capacity is renewable?
91% of the operating capacity in this dataset (5.8 GW of 6.4 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Tajikistan building renewables?
Operating plants that started from 2015 to 2025 total 1.2 GW, and the biggest single year in the data is 1972 with 2.7 GW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Tajikistan?
Nurek hydroelectric plant, a hydropower plant of 2.7 GW, which started operating in 1972.
How much renewable capacity is being built or planned in Tajikistan?
2.7 GW is under construction and 2.3 GW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.