Renewable energy in Togo
Togo has 147 MW of operating renewable capacity in the data, across 4 plants. Solar PV is the largest source at 81 MW (55% of the total). That is 47% of the 312 MW of operating power capacity of all kinds that the same tracker lists for Togo (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 81 MW, which is 55% of today's operating renewable capacity. A further 25 MW is under construction and 959 MW is announced or in pre-construction.
- Operating
- 147 MW4 plants
- Share of capacity in this dataset
- 47%of 312 MW operating, all kinds
- Started 2015 to 2025
- 81 MWoperating plants
- Pipeline
- 984 MW25 MW building, 959 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 81 MW | 3 | 55% | 25 MW | 959 MW |
| Hydropower | 66 MW | 1 | 45% | 0 | 0 |
| All renewables | 147 MW | 4 | 100% | 25 MW | 959 MW |
Of the operating solar, 11 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2021 | 50 MW | 50 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2022 | 11 MW | 11 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2023 | 20 MW | 20 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1988 with 66 MW.
Largest renewable plants in Togo
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Sheikh Mohamed Bin Zayed solar farm | Solar PV | 70 MW | Operating | 2021 |
| 2 | Nangbeto hydroelectric plant | Hydropower | 66 MW | Operating | 1988 |
| 3 | Maritime Region solar projectNC | Solar PV | 8 MW | Operating | 2022 |
| 4 | Kara Kozah solar projectNC | Solar PV | 3 MW | Operating | 2022 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Togo solar farm | Solar PV | 400 MW | Announced | not recorded |
| 2 | ARISE IIP solar farm | Solar PV | 390 MW | Announced | 2028 |
| 3 | Sokodé solar farm | Solar PV | 64 MW | Announced | 2027 |
| 4 | Salimde solar farm | Solar PV | 50 MW | Announced | not recorded |
| 5 | Sheikh Mohamed Bin Zayed solar farm | Solar PV | 30 MW | Announced | not recorded |
Questions
How much renewable energy capacity does Togo have?
Togo has 147 MW of operating renewable capacity across 4 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Togo?
Solar PV, with 81 MW operating, which is 55% of Togo's operating renewable capacity in the data.
What share of Togo's power capacity is renewable?
47% of the operating capacity in this dataset (147 MW of 312 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Togo building renewables?
Operating plants that started from 2015 to 2025 total 81 MW, and the biggest single year in the data is 1988 with 66 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Togo?
Sheikh Mohamed Bin Zayed solar farm, a solar pv plant of 70 MW, which started operating in 2021.
How much renewable capacity is being built or planned in Togo?
25 MW is under construction and 959 MW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.