Renewable energy in Saint Helena, Ascension, and Tristan da Cunha

The data holds no operating renewable plants for Saint Helena, Ascension, and Tristan da Cunha. A further 0 MW is under construction and 3 MW is announced or in pre-construction.

Operating
None recorded0 plants
Share of capacity in this dataset
Not recordedof 0 MW operating, all kinds
Started 2015 to 2025
None recordedoperating plants
Pipeline
3 MW0 MW building, 3 MW announced

Capacity by technology

Renewable capacity in Saint Helena, Ascension, and Tristan da Cunha by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Onshore wind00n/a03 MW
All renewables0 MW0n/a0 MW3 MW

The build-out by year

No start years are recorded for operating plants in Saint Helena, Ascension, and Tristan da Cunha.

Largest renewable plants in Saint Helena, Ascension, and Tristan da Cunha

No operating renewable plants are recorded.

Largest in the pipeline

The five largest renewable projects under construction or announced in Saint Helena, Ascension, and Tristan da Cunha.
#PlantTechnologyCapacityStatusStarted
1Saint Helena (PASH) wind farmOnshore wind3 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Saint Helena, Ascension, and Tristan da Cunha have?

The data holds no operating renewable plants for Saint Helena, Ascension, and Tristan da Cunha. Pipeline: 3 MW.

How much renewable capacity is being built or planned in Saint Helena, Ascension, and Tristan da Cunha?

0 MW is under construction and 3 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.