Renewable energy in Papua New Guinea

Papua New Guinea has 260 MW of operating renewable capacity in the data, across 8 plants. Hydropower is the largest source at 224 MW (86% of the total). That is 58% of the 449 MW of operating power capacity of all kinds that the same tracker lists for Papua New Guinea (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 55 MW, which is 21% of today's operating renewable capacity. A further 0 MW is under construction and 890 MW is announced or in pre-construction.

Operating
260 MW8 plants
Share of capacity in this dataset
58%of 449 MW operating, all kinds
Started 2015 to 2025
55 MWoperating plants
Pipeline
890 MW0 MW building, 890 MW announced

Capacity by technology

Renewable capacity in Papua New Guinea by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV1 MW10.4%032 MW
Hydropower224 MW486%0858 MW
Geothermal30 MW112%00
Bioenergy5 MW21.7%00
All renewables260 MW8100%0 MW890 MW

The build-out by year

0 MW50 MW100 MW19901995200020052010201520202025
Solar PVHydropowerGeothermal
Show the figures as a table
Operating renewable capacity in Papua New Guinea by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
199177 MW000077 MW000
200730 MW0000030 MW00
202354 MW000054 MW000
20241 MW1 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 5 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1991 with 77 MW.

Largest renewable plants in Papua New Guinea

The ten largest operating renewable plants in Papua New Guinea.
#PlantTechnologyCapacityStatusStarted
1Ramu 1 hydroelectric plantHydropower77 MWOperating1991
2Ok Menga hydroelectric plantHydropower57 MWOperating1988
3Edevu hydroelectric plantHydropower54 MWOperating2023
4Rouna 2 hydroelectric plantHydropower36 MWOperating1964
5Lihir Island geothermal power plantGeothermal30 MWOperating2007
6Mosa Palm Oil power stationBioenergy3 MWOperatingnot recorded
7Kumbango Palm Oil power stationBioenergy2 MWOperatingnot recorded
8Daru solar farmSolar PV1 MWOperating2024

Largest in the pipeline

The five largest renewable projects under construction or announced in Papua New Guinea.
#PlantTechnologyCapacityStatusStarted
1Frieda River hydroelectric plantHydropower600 MWAnnounced2035
2Ramu 2 hydroelectric plantHydropower180 MWAnnouncednot recorded
3Mongi hydroelectric plantHydropower78 MWAnnouncednot recorded
4Markham Valley solar farmSolar PV11 MWAnnouncednot recorded
5Saussia solar farmSolar PV10 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Papua New Guinea have?

Papua New Guinea has 260 MW of operating renewable capacity across 8 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Papua New Guinea?

Hydropower, with 224 MW operating, which is 86% of Papua New Guinea's operating renewable capacity in the data.

What share of Papua New Guinea's power capacity is renewable?

58% of the operating capacity in this dataset (260 MW of 449 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Papua New Guinea building renewables?

Operating plants that started from 2015 to 2025 total 55 MW, and the biggest single year in the data is 1991 with 77 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Papua New Guinea?

Ramu 1 hydroelectric plant, a hydropower plant of 77 MW, which started operating in 1991.

How much renewable capacity is being built or planned in Papua New Guinea?

0 MW is under construction and 890 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.