Renewable energy in Fiji

Fiji has 178 MW of operating renewable capacity in the data, across 8 plants. Hydropower is the largest source at 120 MW (67% of the total). That is 58% of the 306 MW of operating power capacity of all kinds that the same tracker lists for Fiji (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 31 MW, which is 17% of today's operating renewable capacity. A further 0 MW is under construction and 50 MW is announced or in pre-construction.

Operating
178 MW8 plants
Share of capacity in this dataset
58%of 306 MW operating, all kinds
Started 2015 to 2025
31 MWoperating plants
Pipeline
50 MW0 MW building, 50 MW announced

Capacity by technology

Renewable capacity in Fiji by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV000.0%050 MW
Onshore wind10 MW15.6%00
Hydropower120 MW267%00
Bioenergy48 MW527%00
All renewables178 MW8100%0 MW50 MW

The build-out by year

0 MW25 MW50 MW19901995200020052010201520202025
Onshore windHydropowerBioenergy
Show the figures as a table
Operating renewable capacity in Fiji by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
200810 MW0010 MW00000
20095 MW0000005 MW0
201240 MW000040 MW000
201519 MW00000019 MW0
201712 MW00000012 MW0

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 12 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1983 with 80 MW.

Largest renewable plants in Fiji

The ten largest operating renewable plants in Fiji.
#PlantTechnologyCapacityStatusStarted
1Wailoa hydroelectric plantHydropower80 MWOperating1983
2Nadarivatu hydroelectric plantHydropower40 MWOperating2012
3Drasa Sawmill power stationBioenergy12 MWOperatingnot recorded
4Nabou power stationBioenergy12 MWOperating2017
5Butoni wind farmOnshore wind10 MWOperating2008
6Labasa Mill power stationBioenergy10 MWOperating2015
7Rarawai Mill power stationBioenergy9 MWOperating2015
8Lautoka Mill power stationBioenergy5 MWOperating2009

Largest in the pipeline

The five largest renewable projects under construction or announced in Fiji.
#PlantTechnologyCapacityStatusStarted
1Vakabuli solar projectSolar PV10 MWAnnouncednot recorded
2Vanua Levu solar farmSolar PV10 MWAnnouncednot recorded
3Tavua solar farmSolar PV10 MWAnnouncednot recorded
4Ba solar farmSolar PV7 MWAnnouncednot recorded
5Qeleloa solar farmSolar PV5 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Fiji have?

Fiji has 178 MW of operating renewable capacity across 8 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Fiji?

Hydropower, with 120 MW operating, which is 67% of Fiji's operating renewable capacity in the data.

What share of Fiji's power capacity is renewable?

58% of the operating capacity in this dataset (178 MW of 306 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Fiji building renewables?

Operating plants that started from 2015 to 2025 total 31 MW, and the biggest single year in the data is 1983 with 80 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Fiji?

Wailoa hydroelectric plant, a hydropower plant of 80 MW, which started operating in 1983.

How much renewable capacity is being built or planned in Fiji?

0 MW is under construction and 50 MW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.