Renewable energy in Pakistan
Pakistan has 15.3 GW of operating renewable capacity in the data, across 220 plants. Hydropower is the largest source at 11.5 GW (75% of the total). That is 32% of the 47.8 GW of operating power capacity of all kinds that the same tracker lists for Pakistan (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 7.9 GW, which is 52% of today's operating renewable capacity. A further 10.0 GW is under construction and 31.2 GW is announced or in pre-construction.
- Operating
- 15.3 GW220 plants
- Share of capacity in this dataset
- 32%of 47.8 GW operating, all kinds
- Started 2015 to 2025
- 7.9 GWoperating plants
- Pipeline
- 41.2 GW10.0 GW building, 31.2 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 1.4 GW | 150 | 9.0% | 0 | 3.3 GW |
| Onshore wind | 1.9 GW | 33 | 13% | 0 | 700 MW |
| Hydropower | 11.5 GW | 21 | 75% | 10.0 GW | 27.3 GW |
| Bioenergy | 517 MW | 16 | 3.4% | 50 MW | 0 |
| All renewables | 15.3 GW | 220 | 100% | 10.0 GW | 31.2 GW |
Of the operating solar, 532 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2000 | 30 MW | 0 | 0 | 0 | 0 | 30 MW | 0 | 0 | 0 |
| 2001 | 184 MW | 0 | 0 | 0 | 0 | 184 MW | 0 | 0 | 0 |
| 2003 | 1.5 GW | 0 | 0 | 0 | 0 | 1,450 MW | 0 | 0 | 0 |
| 2008 | 81 MW | 0 | 0 | 0 | 0 | 81 MW | 0 | 0 | 0 |
| 2012 | 134 MW | 0 | 0 | 50 MW | 0 | 72 MW | 0 | 12 MW | 0 |
| 2013 | 481 MW | 0 | 0 | 50 MW | 0 | 431 MW | 0 | 0 | 0 |
| 2014 | 153 MW | 0 | 0 | 100 MW | 0 | 0 | 0 | 53 MW | 0 |
| 2015 | 301 MW | 100 MW | 0 | 100 MW | 0 | 0 | 0 | 101 MW | 0 |
| 2016 | 583 MW | 300 MW | 0 | 283 MW | 0 | 0 | 0 | 0 | 0 |
| 2017 | 567 MW | 27 MW | 0 | 349 MW | 0 | 150 MW | 0 | 41 MW | 0 |
| 2018 | 2.9 GW | 70 MW | 0 | 249 MW | 0 | 2,487 MW | 0 | 87 MW | 0 |
| 2019 | 155 MW | 83 MW | 0 | 50 MW | 0 | 0 | 0 | 22 MW | 0 |
| 2020 | 140 MW | 38 MW | 0 | 0 | 0 | 102 MW | 0 | 0 | 0 |
| 2021 | 211 MW | 74 MW | 0 | 100 MW | 0 | 37 MW | 0 | 0 | 0 |
| 2022 | 1.5 GW | 243 MW | 0 | 510 MW | 0 | 720 MW | 0 | 0 | 0 |
| 2023 | 170 MW | 170 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2024 | 1.3 GW | 248 MW | 0 | 100 MW | 0 | 884 MW | 0 | 61 MW | 0 |
| 2025 | 95 MW | 22 MW | 0 | 0 | 0 | 41 MW | 0 | 32 MW | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 108 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1977 with 3.5 GW.
Largest renewable plants in Pakistan
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Tarbela hydroelectric plant | Hydropower | 3.5 GW | Operating | 1977 |
| 2 | Ghazi Barotha hydroelectric plant | Hydropower | 1.5 GW | Operating | 2003 |
| 3 | Tarbela 4th Extension hydroelectric plant | Hydropower | 1.4 GW | Operating | 2018 |
| 4 | Mangla hydroelectric plant | Hydropower | 1.1 GW | Operating | 1986 |
| 5 | Neelum Jhelum hydroelectric plant | Hydropower | 969 MW | Operating | 2018 |
| 6 | Suki Kinari hydroelectric plant | Hydropower | 884 MW | Operating | 2024 |
| 7 | Karot hydroelectric plant | Hydropower | 720 MW | Operating | 2022 |
| 8 | Quaid-E-Azam solar farm | Solar PV | 400 MW | Operating | 2015 |
| 9 | Warsak hydroelectric plant | Hydropower | 243 MW | Operating | 1960 |
| 10 | Chashma hydroelectric plant | Hydropower | 184 MW | Operating | 2001 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Bunji hydroelectric plant | Hydropower | 7.1 GW | Announced | not recorded |
| 2 | Diamer Basha hydroelectric plant | Hydropower | 4.5 GW | Under construction | 2028 |
| 3 | Yulbo hydroelectric plant | Hydropower | 2.8 GW | Announced | not recorded |
| 4 | Patan hydroelectric plant | Hydropower | 2.4 GW | Announced | not recorded |
| 5 | Thakot I hydroelectric plant | Hydropower | 2.2 GW | Announced | not recorded |
Questions
How much renewable energy capacity does Pakistan have?
Pakistan has 15.3 GW of operating renewable capacity across 220 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Pakistan?
Hydropower, with 11.5 GW operating, which is 75% of Pakistan's operating renewable capacity in the data.
What share of Pakistan's power capacity is renewable?
32% of the operating capacity in this dataset (15.3 GW of 47.8 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Pakistan building renewables?
Operating plants that started from 2015 to 2025 total 7.9 GW, and the biggest single year in the data is 1977 with 3.5 GW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Pakistan?
Tarbela hydroelectric plant, a hydropower plant of 3.5 GW, which started operating in 1977.
How much renewable capacity is being built or planned in Pakistan?
10.0 GW is under construction and 31.2 GW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.