Renewable energy in Saudi Arabia
Saudi Arabia has 12.0 GW of operating renewable capacity in the data, across 64 plants. Solar PV is the largest source at 11.5 GW (96% of the total). That is 11% of the 113 GW of operating power capacity of all kinds that the same tracker lists for Saudi Arabia (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 11.9 GW, which is 100% of today's operating renewable capacity. A further 9.8 GW is under construction and 32.5 GW is announced or in pre-construction.
- Operating
- 12.0 GW64 plants
- Share of capacity in this dataset
- 11%of 113 GW operating, all kinds
- Started 2015 to 2025
- 11.9 GWoperating plants
- Pipeline
- 42.3 GW9.8 GW building, 32.5 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 11.5 GW | 61 | 96% | 8.1 GW | 23.7 GW |
| Concentrated solar | 93 MW | 2 | 0.8% | 0 | 0 |
| Onshore wind | 400 MW | 1 | 3.3% | 1.7 GW | 7.8 GW |
| Bioenergy | 0 | 0 | 0.0% | 0 | 300 MW |
| Wind (type not stated) | 0 | 0 | 0.0% | 0 | 700 MW |
| All renewables | 12.0 GW | 64 | 100% | 9.8 GW | 32.5 GW |
Of the operating solar, 140 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2012 | 10 MW | 10 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2017 | 30 MW | 30 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2018 | 51 MW | 8 MW | 43 MW | 0 | 0 | 0 | 0 | 0 | 0 |
| 2019 | 28 MW | 28 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2020 | 309 MW | 309 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2021 | 441 MW | 41 MW | 0 | 400 MW | 0 | 0 | 0 | 0 | 0 |
| 2022 | 27 MW | 27 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2023 | 1.8 GW | 1,822 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2024 | 2.3 GW | 2,253 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2025 | 7.0 GW | 6,987 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 50 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2025 with 7.0 GW.
Largest renewable plants in Saudi Arabia
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Shuaibah 2 solar farm | Solar PV | 2.1 GW | Operating | 2025 |
| 2 | Ar Rass Solar PV 2 | Solar PV | 2.0 GW | Operating | 2025 |
| 3 | Sudair Solar PV Project | Solar PV | 1.5 GW | Operating | 2023 |
| 4 | Al Kahfah solar farm | Solar PV | 1.4 GW | Operating | 2025 |
| 5 | Saad Solar PV Plant 2 | Solar PV | 1.1 GW | Operating | 2025 |
| 6 | Ar Rass Solar PV | Solar PV | 700 MW | Operating | 2024 |
| 7 | Al-Faisaliah (Shuaibah) Solar | Solar PV | 600 MW | Operating | 2024 |
| 8 | Rabigh Solar PV | Solar PV | 400 MW | Operating | 2023 |
| 9 | Red Sea Solar Plant | Solar PV | 400 MW | Operating | 2024 |
| 10 | Dumat Al Jandal wind farm | Onshore wind | 400 MW | Operating | 2021 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Bisha solar farm | Solar PV | 3.0 GW | Announced | not recorded |
| 2 | Humaji solar farm | Solar PV | 3.0 GW | Announced | not recorded |
| 3 | NEOM Green Hydrogen solar farm | Solar PV | 2.2 GW | Under construction | 2026 |
| 4 | Afif 1 solar farm | Solar PV | 2.0 GW | Announced | 2028 |
| 5 | Afif 2 solar farm | Solar PV | 2.0 GW | Announced | 2028 |
Questions
How much renewable energy capacity does Saudi Arabia have?
Saudi Arabia has 12.0 GW of operating renewable capacity across 64 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Saudi Arabia?
Solar PV, with 11.5 GW operating, which is 96% of Saudi Arabia's operating renewable capacity in the data.
What share of Saudi Arabia's power capacity is renewable?
11% of the operating capacity in this dataset (12.0 GW of 113 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Saudi Arabia building renewables?
Operating plants that started from 2015 to 2025 total 11.9 GW, and the biggest single year in the data is 2025 with 7.0 GW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Saudi Arabia?
Shuaibah 2 solar farm, a solar pv plant of 2.1 GW, which started operating in 2025.
How much renewable capacity is being built or planned in Saudi Arabia?
9.8 GW is under construction and 32.5 GW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.