Renewable energy in Lebanon
Lebanon has 195 MW of operating renewable capacity in the data, across 7 plants. Hydropower is the largest source at 190 MW (97% of the total). That is 6.5% of the 3.0 GW of operating power capacity of all kinds that the same tracker lists for Lebanon (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 5 MW, which is 2.6% of today's operating renewable capacity. A further 100 MW is under construction and 220 MW is announced or in pre-construction.
- Operating
- 195 MW7 plants
- Share of capacity in this dataset
- 6.5%of 3.0 GW operating, all kinds
- Started 2015 to 2025
- 5 MWoperating plants
- Pipeline
- 320 MW100 MW building, 220 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 5 MW | 4 | 2.6% | 0 | 0 |
| Onshore wind | 0 | 0 | 0.0% | 0 | 220 MW |
| Hydropower | 190 MW | 3 | 97% | 100 MW | 0 |
| All renewables | 195 MW | 7 | 100% | 100 MW | 220 MW |
Of the operating solar, 5 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2022 | 1 MW | 1 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2023 | 3 MW | 3 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2024 | 1 MW | 1 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1965 with 108 MW.
Largest renewable plants in Lebanon
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Boulous Arqash hydroelectric plant | Hydropower | 108 MW | Operating | 1965 |
| 2 | Charles Helou hydroelectric plant | Hydropower | 48 MW | Operating | 1968 |
| 3 | Ibrahim Abdel Aal hydroelectric plant | Hydropower | 34 MW | Operating | 1962 |
| 4 | Beqaa Governorate solar project INC | Solar PV | 2 MW | Operating | 2023 |
| 5 | Beqaa Governorate solar project IINC | Solar PV | 1 MW | Operating | 2024 |
| 6 | Keserwan-Jbeil Governorate solar projectNC | Solar PV | 1 MW | Operating | 2023 |
| 7 | North Governorate solar projectNC | Solar PV | 1 MW | Operating | 2022 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Janneh Dam hydroelectric plant | Hydropower | 100 MW | Under construction | 2027 |
| 2 | Sustainable Akkar wind farm | Onshore wind | 82 MW | Announced | not recorded |
| 3 | Hawa Akkar wind farm | Onshore wind | 70 MW | Announced | not recorded |
| 4 | Lebanon Wind Power wind farm | Onshore wind | 68 MW | Announced | not recorded |
Questions
How much renewable energy capacity does Lebanon have?
Lebanon has 195 MW of operating renewable capacity across 7 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Lebanon?
Hydropower, with 190 MW operating, which is 97% of Lebanon's operating renewable capacity in the data.
What share of Lebanon's power capacity is renewable?
6.5% of the operating capacity in this dataset (195 MW of 3.0 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Lebanon building renewables?
Operating plants that started from 2015 to 2025 total 5 MW, and the biggest single year in the data is 1965 with 108 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Lebanon?
Boulous Arqash hydroelectric plant, a hydropower plant of 108 MW, which started operating in 1965.
How much renewable capacity is being built or planned in Lebanon?
100 MW is under construction and 220 MW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.