Renewable energy in Kuwait

Kuwait has 41 MW of operating renewable capacity in the data, across 4 plants. Solar PV is the largest source at 31 MW (76% of the total). That is 0.2% of the 20.4 GW of operating power capacity of all kinds that the same tracker lists for Kuwait (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 41 MW, which is 100% of today's operating renewable capacity. A further 0 MW is under construction and 4.4 GW is announced or in pre-construction.

Operating
41 MW4 plants
Share of capacity in this dataset
0.2%of 20.4 GW operating, all kinds
Started 2015 to 2025
41 MWoperating plants
Pipeline
4.4 GW0 MW building, 4.4 GW announced

Capacity by technology

Renewable capacity in Kuwait by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV31 MW376%04.4 GW
Onshore wind10 MW124%00
All renewables41 MW4100%0 MW4.4 GW

Of the operating solar, 21 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW25 MW50 MW19901995200020052010201520202025
Solar PVOnshore wind
Show the figures as a table
Operating renewable capacity in Kuwait by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
201729 MW19 MW010 MW00000
201810 MW10 MW0000000
20242 MW2 MW0000000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2017 with 29 MW.

Largest renewable plants in Kuwait

The ten largest operating renewable plants in Kuwait.
#PlantTechnologyCapacityStatusStarted
1Sidrah 500 solar farmNCSolar PV19 MWOperating2017
2Al Shagaya Solar Energy ParkSolar PV10 MWOperating2018
3Shagaya Wind ProjectOnshore wind10 MWOperating2017
4Umm Al-Aish solar projectNCSolar PV2 MWOperating2024

Largest in the pipeline

The five largest renewable projects under construction or announced in Kuwait.
#PlantTechnologyCapacityStatusStarted
1Al Shagaya Solar Energy ParkSolar PV4.3 GWAnnounced2027
2Al Abdaliyah solar farmSolar PV60 MWAnnounced2027

Questions

How much renewable energy capacity does Kuwait have?

Kuwait has 41 MW of operating renewable capacity across 4 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Kuwait?

Solar PV, with 31 MW operating, which is 76% of Kuwait's operating renewable capacity in the data.

What share of Kuwait's power capacity is renewable?

0.2% of the operating capacity in this dataset (41 MW of 20.4 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Kuwait building renewables?

Operating plants that started from 2015 to 2025 total 41 MW, and the biggest single year in the data is 2017 with 29 MW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Kuwait?

Sidrah 500 solar farm, a solar pv plant of 19 MW, which started operating in 2017.

How much renewable capacity is being built or planned in Kuwait?

0 MW is under construction and 4.4 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.