Renewable energy in India
India has 187 GW of operating renewable capacity in the data, across 4,721 plants. Solar PV is the largest source at 99.1 GW (53% of the total). That is 39% of the 485 GW of operating power capacity of all kinds that the same tracker lists for India (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 119 GW, which is 64% of today's operating renewable capacity. A further 143 GW is under construction and 152 GW is announced or in pre-construction.
- Operating
- 187 GW4,721 plants
- Share of capacity in this dataset
- 39%of 485 GW operating, all kinds
- Started 2015 to 2025
- 119 GWoperating plants
- Pipeline
- 295 GW143 GW building, 152 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 99.1 GW | 3,683 | 53% | 104 GW | 89.4 GW |
| Concentrated solar | 225 MW | 3 | 0.1% | 0 | 50 MW |
| Onshore wind | 38.9 GW | 620 | 21% | 25.7 GW | 17.3 GW |
| Offshore wind | 0 | 0 | 0.0% | 0 | 5.0 GW |
| Hydropower | 43.8 GW | 214 | 23% | 13.2 GW | 37.5 GW |
| Bioenergy | 4.8 GW | 200 | 2.6% | 44 MW | 150 MW |
| Wind (type not stated) | 10 MW | 1 | <0.1% | 667 MW | 2.4 GW |
| All renewables | 187 GW | 4,721 | 100% | 143 GW | 152 GW |
Of the operating solar, 15.6 GW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 1990 | 95 MW | 0 | 0 | 15 MW | 0 | 80 MW | 0 | 0 | 0 |
| 1991 | 378 MW | 0 | 0 | 0 | 0 | 378 MW | 0 | 0 | 0 |
| 1992 | 336 MW | 0 | 0 | 0 | 0 | 318 MW | 0 | 18 MW | 0 |
| 1993 | 65 MW | 0 | 0 | 0 | 0 | 0 | 0 | 65 MW | 0 |
| 1994 | 725 MW | 0 | 0 | 0 | 0 | 660 MW | 0 | 65 MW | 0 |
| 1995 | 66 MW | 0 | 0 | 10 MW | 0 | 50 MW | 0 | 6 MW | 0 |
| 1996 | 649 MW | 0 | 0 | 120 MW | 0 | 514 MW | 0 | 15 MW | 0 |
| 1997 | 458 MW | 0 | 0 | 0 | 0 | 405 MW | 0 | 53 MW | 0 |
| 1998 | 232 MW | 0 | 0 | 0 | 0 | 188 MW | 0 | 44 MW | 0 |
| 1999 | 1.7 GW | 0 | 0 | 0 | 0 | 1,695 MW | 0 | 0 | 0 |
| 2000 | 936 MW | 0 | 0 | 0 | 0 | 930 MW | 0 | 6 MW | 0 |
| 2001 | 547 MW | 0 | 0 | 59 MW | 0 | 448 MW | 0 | 40 MW | 0 |
| 2002 | 479 MW | 0 | 0 | 0 | 0 | 435 MW | 0 | 44 MW | 0 |
| 2003 | 2.2 GW | 0 | 0 | 0 | 0 | 2,100 MW | 0 | 124 MW | 0 |
| 2004 | 1.8 GW | 0 | 0 | 49 MW | 0 | 1,540 MW | 0 | 189 MW | 0 |
| 2005 | 630 MW | 0 | 0 | 105 MW | 0 | 453 MW | 0 | 72 MW | 0 |
| 2006 | 1.9 GW | 0 | 0 | 108 MW | 0 | 1,616 MW | 0 | 128 MW | 0 |
| 2007 | 1.3 GW | 0 | 0 | 152 MW | 0 | 1,010 MW | 0 | 169 MW | 0 |
| 2008 | 2.3 GW | 0 | 0 | 536 MW | 0 | 1,498 MW | 0 | 252 MW | 0 |
| 2009 | 512 MW | 0 | 0 | 367 MW | 0 | 0 | 0 | 145 MW | 0 |
| 2010 | 1.6 GW | 0 | 0 | 552 MW | 0 | 812 MW | 0 | 193 MW | 0 |
| 2011 | 2.3 GW | 98 MW | 0 | 604 MW | 0 | 1,271 MW | 0 | 311 MW | 0 |
| 2012 | 2.8 GW | 529 MW | 125 MW | 1,342 MW | 0 | 375 MW | 0 | 436 MW | 0 |
| 2013 | 3.0 GW | 736 MW | 50 MW | 1,466 MW | 0 | 557 MW | 0 | 169 MW | 0 |
| 2014 | 2.8 GW | 722 MW | 50 MW | 952 MW | 0 | 932 MW | 0 | 97 MW | 0 |
| 2015 | 5.1 GW | 1,265 MW | 0 | 1,802 MW | 0 | 1,916 MW | 0 | 101 MW | 0 |
| 2016 | 6.3 GW | 3,391 MW | 0 | 2,299 MW | 0 | 475 MW | 0 | 153 MW | 0 |
| 2017 | 16.5 GW | 12,102 MW | 0 | 2,654 MW | 0 | 1,679 MW | 0 | 50 MW | 0 |
| 2018 | 11.8 GW | 9,004 MW | 0 | 2,234 MW | 0 | 440 MW | 0 | 76 MW | 0 |
| 2019 | 8.3 GW | 6,099 MW | 0 | 2,127 MW | 0 | 0 | 0 | 30 MW | 0 |
| 2020 | 5.0 GW | 3,632 MW | 0 | 548 MW | 0 | 810 MW | 0 | 0 | 0 |
| 2021 | 9.1 GW | 7,372 MW | 0 | 1,445 MW | 0 | 213 MW | 0 | 38 MW | 0 |
| 2022 | 15.7 GW | 13,529 MW | 0 | 1,864 MW | 0 | 300 MW | 0 | 0 | 0 |
| 2023 | 8.1 GW | 5,361 MW | 0 | 2,614 MW | 0 | 60 MW | 0 | 55 MW | 0 |
| 2024 | 17.3 GW | 15,476 MW | 0 | 1,757 MW | 0 | 100 MW | 0 | 12 MW | 0 |
| 2025 | 15.7 GW | 13,215 MW | 0 | 1,275 MW | 0 | 1,140 MW | 0 | 24 MW | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 20.1 GW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2024 with 17.3 GW.
Largest renewable plants in India
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Khavda (Adani) IV solar farm | Solar PV | 2.0 GW | Operating | not recorded |
| 2 | Fatehgarh (Adani) solar farm | Solar PV | 1.5 GW | Operating | 2025 |
| 3 | Nathpa Jhakri hydroelectric plant | Hydropower | 1.5 GW | Operating | 2003 |
| 4 | Bhinajpura solar farm | Solar PV | 1.3 GW | Operating | 2025 |
| 5 | Teesta-III hydroelectric plant | Hydropower | 1.2 GW | Operating | 2017 |
| 6 | Karcham Wangtoo hydroelectric plant | Hydropower | 1.0 GW | Operating | 2011 |
| 7 | Sharavathy hydroelectric plant | Hydropower | 1.0 GW | Operating | 1965 |
| 8 | Bhadla III Solar Park | Solar PV | 1.0 GW | Operating | 2018 |
| 9 | Khavda (Adani) solar farm | Solar PV | 1.0 GW | Operating | 2024 |
| 10 | Rajasthan (SJVN) III solar farm | Solar PV | 1.0 GW | Operating | 2025 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Siang Upper hydroelectric plant | Hydropower | 10.0 GW | Announced | not recorded |
| 2 | Ladakh Solar Park | Solar PV | 9.0 GW | Announced | 2029 |
| 3 | Pancheshwar hydroelectric plant | Hydropower | 6.5 GW | Announced | 2034 |
| 4 | Jaisalmer Manufacturing (Adani Group) solar farm | Solar PV | 4.9 GW | Under construction | 2026 |
| 5 | Kutch (NTPC) Solar Park | Solar PV | 4.8 GW | Under construction | 2026 |
Questions
How much renewable energy capacity does India have?
India has 187 GW of operating renewable capacity across 4,721 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in India?
Solar PV, with 99.1 GW operating, which is 53% of India's operating renewable capacity in the data.
What share of India's power capacity is renewable?
39% of the operating capacity in this dataset (187 GW of 485 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is India building renewables?
Operating plants that started from 2015 to 2025 total 119 GW, and the biggest single year in the data is 2024 with 17.3 GW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in India?
Khavda (Adani) IV solar farm, a solar pv plant of 2.0 GW.
How much renewable capacity is being built or planned in India?
143 GW is under construction and 152 GW is announced or in pre-construction. Some announced projects will never be built.
Does India have offshore wind?
Yes: 0 MW operating, 0 MW under construction and 5.0 GW announced or in pre-construction.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.