Renewable energy in Georgia

Georgia has 3.0 GW of operating renewable capacity in the data, across 29 plants. Hydropower is the largest source at 3.0 GW (99% of the total). That is 72% of the 4.2 GW of operating power capacity of all kinds that the same tracker lists for Georgia (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 495 MW, which is 16% of today's operating renewable capacity. A further 787 MW is under construction and 1.9 GW is announced or in pre-construction.

Operating
3.0 GW29 plants
Share of capacity in this dataset
72%of 4.2 GW operating, all kinds
Started 2015 to 2025
495 MWoperating plants
Pipeline
2.7 GW787 MW building, 1.9 GW announced

Capacity by technology

Renewable capacity in Georgia by technology, operating and pipeline. Announced includes pre-construction.
TechnologyOperatingPlantsShareUnder constructionAnnounced
Solar PV13 MW60.4%0169 MW
Onshore wind21 MW10.7%0574 MW
Hydropower3.0 GW2299%787 MW1.2 GW
All renewables3.0 GW29100%787 MW1.9 GW

Of the operating solar, 13 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.

The build-out by year

0 MW250 MW500 MW19901995200020052010201520202025
Solar PVOnshore windHydropower
Show the figures as a table
Operating renewable capacity in Georgia by the year it started, 1990 to 2025
YearStarted operatingSolar PVConcentrated solarOnshore windOffshore windHydropowerGeothermalBioenergyWind (type not stated)
201485 MW000085 MW000
2016129 MW0021 MW0108 MW000
2017226 MW0000226 MW000
201851 MW000051 MW000
201930 MW000030 MW000
20235 MW5 MW0000000
202454 MW8 MW00046 MW000

Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1978 with 1.3 GW.

Largest renewable plants in Georgia

The ten largest operating renewable plants in Georgia.
#PlantTechnologyCapacityStatusStarted
1Enguri hydroelectric plantHydropower1.3 GWOperating1978
2Vardnili-1 hydroelectric plantHydropower220 MWOperating1971
3Shuakhevi hydroelectric plantHydropower179 MWOperating2017
4Zhinvali hydroelectric plantHydropower130 MWOperating1984
5Khrami I hydroelectric plantHydropower114 MWOperating1947
6Lajanuri hydroelectric plantHydropower112 MWOperating1960
7Khrami II hydroelectric plantHydropower110 MWOperating1963
8Dariali hydroelectric plantHydropower108 MWOperating2016
9Paravani hydroelectric plantHydropower85 MWOperating2014
10Dzevrula hydroelectric plantHydropower80 MWOperating1956

Largest in the pipeline

The five largest renewable projects under construction or announced in Georgia.
#PlantTechnologyCapacityStatusStarted
1Khudoni hydroelectric plantHydropower702 MWUnder constructionnot recorded
2Nenskra hydroelectric plantHydropower280 MWAnnouncednot recorded
3Dizi hydroelectric plantHydropower250 MWAnnouncednot recorded
4Kvanchiani hydroelectric plantHydropower230 MWAnnouncednot recorded
5Imereti (Gogni) wind farmOnshore wind224 MWAnnouncednot recorded

Questions

How much renewable energy capacity does Georgia have?

Georgia has 3.0 GW of operating renewable capacity across 29 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).

What is the biggest source of renewable capacity in Georgia?

Hydropower, with 3.0 GW operating, which is 99% of Georgia's operating renewable capacity in the data.

What share of Georgia's power capacity is renewable?

72% of the operating capacity in this dataset (3.0 GW of 4.2 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.

How fast is Georgia building renewables?

Operating plants that started from 2015 to 2025 total 495 MW, and the biggest single year in the data is 1978 with 1.3 GW. Plants with no recorded start year are not counted in the build-out by year.

What is the largest renewable plant in Georgia?

Enguri hydroelectric plant, a hydropower plant of 1.3 GW, which started operating in 1978.

How much renewable capacity is being built or planned in Georgia?

787 MW is under construction and 1.9 GW is announced or in pre-construction. Some announced projects will never be built.

Where does this data come from?

Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.

Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.