Renewable energy in North Korea
North Korea has 3.3 GW of operating renewable capacity in the data, across 17 plants. Hydropower is the largest source at 3.3 GW (100% of the total). That is 50% of the 6.5 GW of operating power capacity of all kinds that the same tracker lists for North Korea (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 394 MW, which is 12% of today's operating renewable capacity. A further 550 MW is under construction and 0 MW is announced or in pre-construction.
- Operating
- 3.3 GW17 plants
- Share of capacity in this dataset
- 50%of 6.5 GW operating, all kinds
- Started 2015 to 2025
- 394 MWoperating plants
- Pipeline
- 550 MW550 MW building, 0 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Hydropower | 3.3 GW | 17 | 100% | 550 MW | 0 |
| All renewables | 3.3 GW | 17 | 100% | 550 MW | 0 MW |
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 1996 | 100 MW | 0 | 0 | 0 | 0 | 100 MW | 0 | 0 | 0 |
| 2002 | 100 MW | 0 | 0 | 0 | 0 | 100 MW | 0 | 0 | 0 |
| 2007 | 50 MW | 0 | 0 | 0 | 0 | 50 MW | 0 | 0 | 0 |
| 2012 | 300 MW | 0 | 0 | 0 | 0 | 300 MW | 0 | 0 | 0 |
| 2015 | 120 MW | 0 | 0 | 0 | 0 | 120 MW | 0 | 0 | 0 |
| 2016 | 140 MW | 0 | 0 | 0 | 0 | 140 MW | 0 | 0 | 0 |
| 2022 | 134 MW | 0 | 0 | 0 | 0 | 134 MW | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1976 with 510 MW.
Largest renewable plants in North Korea
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Sodusu hydroelectric plant | Hydropower | 510 MW | Operating | 1976 |
| 2 | Unbong hydroelectric plant | Hydropower | 400 MW | Operating | 1942 |
| 3 | Heocheongang hydroelectric plant | Hydropower | 394 MW | Operating | 1941 |
| 4 | Jangjingang hydroelectric plant | Hydropower | 381 MW | Operating | 1932 |
| 5 | Kanggye Youth hydroelectric plant | Hydropower | 218 MW | Operating | 1940 |
| 6 | Taedonggang hydroelectric plant | Hydropower | 200 MW | Operating | 1983 |
| 7 | Huichon 1 hydroelectric plant | Hydropower | 150 MW | Operating | 2012 |
| 8 | Huichon 2 hydroelectric plant | Hydropower | 150 MW | Operating | 2012 |
| 9 | Orangchon hydroelectric plant | Hydropower | 134 MW | Operating | 2022 |
| 10 | Bujeongang hydroelectric plant | Hydropower | 130 MW | Operating | 1929 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Taechon Youth No 2 hydroelectric plant | Hydropower | 400 MW | Under construction | not recorded |
| 2 | Taechon Youth No 1 hydroelectric plant | Hydropower | 150 MW | Under construction | not recorded |
Questions
How much renewable energy capacity does North Korea have?
North Korea has 3.3 GW of operating renewable capacity across 17 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in North Korea?
Hydropower, with 3.3 GW operating, which is 100% of North Korea's operating renewable capacity in the data.
What share of North Korea's power capacity is renewable?
50% of the operating capacity in this dataset (3.3 GW of 6.5 GW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is North Korea building renewables?
Operating plants that started from 2015 to 2025 total 394 MW, and the biggest single year in the data is 1976 with 510 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in North Korea?
Sodusu hydroelectric plant, a hydropower plant of 510 MW, which started operating in 1976.
How much renewable capacity is being built or planned in North Korea?
550 MW is under construction and 0 MW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.