Renewable energy in Gabon
Gabon has 335 MW of operating renewable capacity in the data, across 5 plants. Hydropower is the largest source at 324 MW (97% of the total). That is 39% of the 852 MW of operating power capacity of all kinds that the same tracker lists for Gabon (share of capacity in this dataset, not of national electricity generation). A further 35 MW is under construction and 862 MW is announced or in pre-construction.
- Operating
- 335 MW5 plants
- Share of capacity in this dataset
- 39%of 852 MW operating, all kinds
- Started 2015 to 2025
- None recordedoperating plants
- Pipeline
- 897 MW35 MW building, 862 MW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 11 MW | 1 | 3.3% | 0 | 69 MW |
| Hydropower | 324 MW | 4 | 97% | 35 MW | 793 MW |
| All renewables | 335 MW | 5 | 100% | 35 MW | 862 MW |
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2013 | 160 MW | 0 | 0 | 0 | 0 | 160 MW | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 11 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 2013 with 160 MW.
Largest renewable plants in Gabon
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Grand Poubara hydroelectric plant | Hydropower | 160 MW | Operating | 2013 |
| 2 | Tchimbele hydroelectric plant | Hydropower | 68 MW | Operating | 1980 |
| 3 | Kinguele hydroelectric plant | Hydropower | 58 MW | Operating | 1980 |
| 4 | Petit Poubara hydroelectric plant | Hydropower | 38 MW | Operating | 1983 |
| 5 | Ayémé Plaine solar farm | Solar PV | 11 MW | Operating | not recorded |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Booué hydroelectric plant | Hydropower | 411 MW | Announced | not recorded |
| 2 | Tséngue-Leledi hydroelectric plant | Hydropower | 300 MW | Announced | not recorded |
| 3 | Ngoulmendjim hydroelectric plant | Hydropower | 82 MW | Announced | not recorded |
| 4 | Libreville solar farm | Solar PV | 50 MW | Announced | not recorded |
| 5 | Kinguélé Aval hydroelectric plant | Hydropower | 35 MW | Under construction | not recorded |
Questions
How much renewable energy capacity does Gabon have?
Gabon has 335 MW of operating renewable capacity across 5 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Gabon?
Hydropower, with 324 MW operating, which is 97% of Gabon's operating renewable capacity in the data.
What share of Gabon's power capacity is renewable?
39% of the operating capacity in this dataset (335 MW of 852 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
What is the largest renewable plant in Gabon?
Grand Poubara hydroelectric plant, a hydropower plant of 160 MW, which started operating in 2013.
How much renewable capacity is being built or planned in Gabon?
35 MW is under construction and 862 MW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.