Renewable energy in Madagascar
Madagascar has 228 MW of operating renewable capacity in the data, across 17 plants. Hydropower is the largest source at 115 MW (50% of the total). That is 36% of the 635 MW of operating power capacity of all kinds that the same tracker lists for Madagascar (share of capacity in this dataset, not of national electricity generation). Plants that started operating from 2015 to 2025 add up to 108 MW, which is 47% of today's operating renewable capacity. A further 120 MW is under construction and 1.0 GW is announced or in pre-construction.
- Operating
- 228 MW17 plants
- Share of capacity in this dataset
- 36%of 635 MW operating, all kinds
- Started 2015 to 2025
- 108 MWoperating plants
- Pipeline
- 1.2 GW120 MW building, 1.0 GW announced
Capacity by technology
| Technology | Operating | Plants | Share | Under construction | Announced |
|---|---|---|---|---|---|
| Solar PV | 97 MW | 14 | 43% | 120 MW | 583 MW |
| Onshore wind | 16 MW | 1 | 7.0% | 0 | 0 |
| Hydropower | 115 MW | 2 | 50% | 0 | 454 MW |
| All renewables | 228 MW | 17 | 100% | 120 MW | 1.0 GW |
Of the operating solar, 46 MW comes from TransitionZero Solar Asset Mapper records (CC BY-NC 4.0, non-commercial reuse only). The open data files list that part separately.
The build-out by year
Show the figures as a table
| Year | Started operating | Solar PV | Concentrated solar | Onshore wind | Offshore wind | Hydropower | Geothermal | Bioenergy | Wind (type not stated) |
|---|---|---|---|---|---|---|---|---|---|
| 2018 | 20 MW | 20 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2020 | 26 MW | 26 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2022 | 34 MW | 34 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2023 | 11 MW | 11 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2024 | 1 MW | 1 MW | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2025 | 16 MW | 0 | 0 | 16 MW | 0 | 0 | 0 | 0 | 0 |
Capacity of today's operating plants, by the year the plant started. Plants since retired are not in the data. 6 MW of operating capacity has no recorded start year and is left out of this chart. Earlier years and 2026 (a partial year) are in the data but outside the chart; the biggest year is 1982 with 91 MW.
Largest renewable plants in Madagascar
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Andekaleka hydroelectric plant | Hydropower | 91 MW | Operating | 1982 |
| 2 | Ambatolampy solar farm | Solar PV | 40 MW | Operating | 2018 |
| 3 | Mandraka hydroelectric plant | Hydropower | 24 MW | Operating | 1972 |
| 4 | Andranotakatra solar farmNC | Solar PV | 17 MW | Operating | 2020 |
| 5 | Ehoala wind farm | Onshore wind | 16 MW | Operating | 2025 |
| 6 | Tolanaro solar projectNC | Solar PV | 9 MW | Operating | 2022 |
| 7 | Ehoala solar farm | Solar PV | 8 MW | Operating | 2023 |
| 8 | Malile (REPP) solar farmNC | Solar PV | 6 MW | Operating | not recorded |
| 9 | Toliary-Ii solar projectNC | Solar PV | 4 MW | Operating | 2020 |
| 10 | Toamasina Toamasina I solar projectNC | Solar PV | 3 MW | Operating | 2020 |
Largest in the pipeline
| # | Plant | Technology | Capacity | Status | Started |
|---|---|---|---|---|---|
| 1 | Moramanga (GSU) solar farm | Solar PV | 300 MW | Announced | 2026 |
| 2 | Ihazolava solar farm | Solar PV | 200 MW | Announced | 2028 |
| 3 | Sahofika hydroelectric plant | Hydropower | 192 MW | Announced | not recorded |
| 4 | Antetezambato hydroelectric plant | Hydropower | 142 MW | Announced | 2030 |
| 5 | Volobe Amont hydroelectric plant | Hydropower | 120 MW | Announced | 2030 |
Questions
How much renewable energy capacity does Madagascar have?
Madagascar has 228 MW of operating renewable capacity across 17 plants in the Global Energy Monitor data (solar, wind, hydropower, geothermal and bioenergy).
What is the biggest source of renewable capacity in Madagascar?
Hydropower, with 115 MW operating, which is 50% of Madagascar's operating renewable capacity in the data.
What share of Madagascar's power capacity is renewable?
36% of the operating capacity in this dataset (228 MW of 635 MW). This is a share of plant capacity listed by Global Energy Monitor, which tracks larger plants, not a share of the electricity actually generated or of national grid statistics.
How fast is Madagascar building renewables?
Operating plants that started from 2015 to 2025 total 108 MW, and the biggest single year in the data is 1982 with 91 MW. Plants with no recorded start year are not counted in the build-out by year.
What is the largest renewable plant in Madagascar?
Andekaleka hydroelectric plant, a hydropower plant of 91 MW, which started operating in 1982.
How much renewable capacity is being built or planned in Madagascar?
120 MW is under construction and 1.0 GW is announced or in pre-construction. Some announced projects will never be built.
Where does this data come from?
Global Energy Monitor, Global Integrated Power Tracker, September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Licensed CC BY 4.0, with some solar records CC BY-NC 4.0. Figures are as recorded by Global Energy Monitor and are not independently confirmed.
Related countries
Data as of September 2026 (Global Energy Monitor, Global Integrated Power Tracker, V2). Status counted: operating, under construction, and announced (including pre-construction). Retired, shelved, cancelled and mothballed plants are left out. Missing values are shown as missing. Method.